Product Description
A wet pan mill is the best equipment to replace a ball mill. because it has small investment, high output, low production cost, good efficiency, and easy installation. And the machine is the ideal beneficiation equipment for small and medium-sized enterprises. A wet pan mill is mainly used to process gold, silver, lead, zinc, iron, molybdenum, copper, and antimony.
Working Principle
The Wet pan mill repeatedly squeezes and mills gold ore through the weight of the wheels until the gold ore has been crushed completely. And then add 1 kg mercury into the water. Meantime, every 5-10 minutes, add gold ore to the machine. After 24 hours, recycle mercury. Then pack mercury with a big density of cloth. Twist the cloth and let the mercury come out. The gold will be left in the cloth.
Main Features of Wet Pan Mill
1.Small investment,high output.
2.Easy installation and maintenance.
3.Good effifiency.
4.The roller is wearproof.
Spare parts
Technical parameters
Model | Type(mm) | Max feed size(mm) | Capacity(t/h) | Power(Kw) | Weight(ton) |
1600 | 1600x350x200x460 | <25 | 1-2 | Y6L-30 | 13.5 |
1500 | 1500x300x150x420 | <25 | 0.8-1.5 | Y6L-22 | 11.3 |
1400 | 1400x260x150x350 | <25 | 0.5-0.8 | Y6L-18.5 | 8.5 |
1200 | 1200x180x120x250 | <25 | 0.25-0.5 | Y6L-7.5 | 5.5 |
1100 | 1100x160x120x250 | <25 | 0.15-0.25 | Y6L-5.5 | 4.5 |
1000 | 1000x180x120x250 | <25 | 0.15-0.2 | Y6L-5.5 | 4.3 |
Packaging and shipping
You May Also Like
Ball Mill Jaw Crusher Hammer Crusher
2-Roller Crusher Cone Crusher Impact Crusher
Company information
FAQ
Q1: Are you trading company or manufacturer?
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.
What minerals are you separating?
What's the maximum size of your raw minerals?
How much capacity do you need per hour for your project?