Product Description
Gold Mills - Wet Disc Mills are used to grind gold ore, especially small gold stones, to 100-150 mesh. Many customers from Africa want to import gold grinding mills. This is because of the low cost and high productivity. Most importantly, with mercury, our customers can get pure gold directly after the gold mill, which is suitable for people who want to start a small gold business.
Working Principle
The main components of the gold mill are organic frame, grinding disc, grinding roller, grinding seat, reducer, motor and so on. Firstly, the motor transmits the power to the reducer, then the central drive shaft transmits to the horizontal shaft, and finally the grinding rollers move counter-clockwise and the material is ground into fine particles in the gold mill.
Main Features of Wet Pan Mill
The gold grinding machine is widely used in cement, silicate products, new building materials, refractory materials, chemical fertilizers, black nonferrous metal mineral processing and glass ceramics and other production industries, all kinds of ore and other grinding materials for dry or wet grinding The All the ball mill can choose the mine, grinding machine can be used.
Spare parts
Technical parameters
Model | Type(mm) | Max feed size(mm) | Capacity(t/h) | Power(Kw) | Weight(ton) |
1600 | 1600x350x200x460 | <25 | 1-2 | Y6L-30 | 13.5 |
1500 | 1500x300x150x420 | <25 | 0.8-1.5 | Y6L-22 | 11.3 |
1400 | 1400x260x150x350 | <25 | 0.5-0.8 | Y6L-18.5 | 8.5 |
1200 | 1200x180x120x250 | <25 | 0.25-0.5 | Y6L-7.5 | 5.5 |
1100 | 1100x160x120x250 | <25 | 0.15-0.25 | Y6L-5.5 | 4.5 |
1000 | 1000x180x120x250 | <25 | 0.15-0.2 | Y6L-5.5 | 4.3 |
Packaging and shipping
You May Also Like
Ball Mill Jaw Crusher Hammer Crusher
2-Roller Crusher Cone Crusher Impact Crusher
Company information
FAQ
Q1: Are you trading company or manufacturer?
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.
What minerals are you separating?
What's the maximum size of your raw minerals?
How much capacity do you need per hour for your project?