Product Description
Gold Grinding Machine (wet pan mill), which is named by the diameter of grinding roller. It ismainly applied for grinding rock gold ore. In Sudan, at least 85% gold miners are using the machine in their gold processing system. The most important point is that our customers can get pure gold directly after wet pan mill, which is suitable for miners who want to begin from small business.Among the models, model 1200 is the most popular one.
Working Principle
The main parts of the wet mill are driving shaft, bearing seat, roller, speed reducer, motor and so on.
First, the motor transfers power to the decelerator, then the central drive shaft transfers to the horizontal shaft, finally the Roller moves the anticlockwise direction, the material in the wet mill is ground into fine particles.
Main Features of Wet Pan Mill
Spare parts
Technical parameters
Model | Type(mm) | Max feed size(mm) | Capacity(t/h) | Power(Kw) | Weight(ton) |
1600 | 1600x350x200x460 | <25 | 1-2 | Y6L-30 | 13.5 |
1500 | 1500x300x150x420 | <25 | 0.8-1.5 | Y6L-22 | 11.3 |
1400 | 1400x260x150x350 | <25 | 0.5-0.8 | Y6L-18.5 | 8.5 |
1200 | 1200x180x120x250 | <25 | 0.25-0.5 | Y6L-7.5 | 5.5 |
1100 | 1100x160x120x250 | <25 | 0.15-0.25 | Y6L-5.5 | 4.5 |
1000 | 1000x180x120x250 | <25 | 0.15-0.2 | Y6L-5.5 | 4.3 |
Packaging and shipping
You May Also Like
Ball Mill Jaw Crusher Hammer Crusher
2-Roller Crusher Cone Crusher Impact Crusher
Company information
FAQ
Q1: Are you trading company or manufacturer?
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.
What minerals are you separating?
What's the maximum size of your raw minerals?
How much capacity do you need per hour for your project?