Product Description
It is used for grinding operations of various ferrous metals,non-ferrous metals, non-metallic minerals, as well as grinding, selecting and processing operations of rare precious metals gold and silver, and is the grinding equipment of the majority of small and medium-sized mineral processing plants and powder making plants.
Working Principle
The Wet pan mill repeatedly squeezes and mills gold ore through the weight of the wheels until the gold ore has been crushed completely. And then add 1 kg mercury into the water. Meantime, every 5-10 minutes, add gold ore to
the machine. After 24 hours, recycle mercury. Then pack mercury with a big density of cloth. Twist the cloth and let the mercury come out. The gold will be left in the cloth.
Main Features of Wet Pan Mill
1. Professional design, so its technical data is reasonable.
2. Short grinding and mixing cycle, high efficiency.
3. Low noise and low consumption. Materials can be ground and mixed evenly.
4. Compact structure, easy to operate and maintain.
Spare parts
Technical parameters
Model | Type(mm) | Max feed size(mm) | Capacity(t/h) | Power(Kw) | Weight(ton) |
1600 | 1600x350x200x460 | <25 | 1-2 | Y6L-30 | 13.5 |
1500 | 1500x300x150x420 | <25 | 0.8-1.5 | Y6L-22 | 11.3 |
1400 | 1400x260x150x350 | <25 | 0.5-0.8 | Y6L-18.5 | 8.5 |
1200 | 1200x180x120x250 | <25 | 0.25-0.5 | Y6L-7.5 | 5.5 |
1100 | 1100x160x120x250 | <25 | 0.15-0.25 | Y6L-5.5 | 4.5 |
1000 | 1000x180x120x250 | <25 | 0.15-0.2 | Y6L-5.5 | 4.3 |
Packaging and shipping
You May Also Like
Ball Mill Jaw Crusher Hammer Crusher
2-Roller Crusher Cone Crusher Impact Crusher
Company information
FAQ
Q1: Are you trading company or manufacturer?
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.
What minerals are you separating?
What's the maximum size of your raw minerals?
How much capacity do you need per hour for your project?