Specifications
Brand Name :
JN
Model Number :
Construction Scaffold Stair Tower
Certification :
CE ISO
Place of Origin :
Hebei, China
MOQ :
Negotiable
Price :
Negotiable
Payment Terms :
T/T, Western Union, L/C
Supply Ability :
5000m per month
Delivery Time :
within 7 days
Packaging Details :
Standard export package or as requested
Material :
Q235 Steel
Cross section size :
2.5m *1.2m
Thickness of horizontal tube :
2.2mm
Thickness of vertical tube :
3.25mm
OEM Service :
Yes
Application :
Highways, Railways,Bridges Construction
Description

Safe And Convenient 2500X1200mm Ring-lock Scaffolding Stair Towers

Technical Parameter:

1. Material: Q235

2. Thickness of vertical tube : 3.25mm

3. Thickness of horizontal tube: 2.2mm

4. Thickness of oblique tube: 1.5mm

5. Height each piece: 3000mm

6. Length each piece: 2500mm

7. Width each piece: 1200mm

8. Weight of each piece : 75KG

Description and Application:

Stair towers are a necessity when safe and quick temporary access is needed on any new construction, rehabilitation, or industrial project.

These Scaffold Towers are perfect to access tall ceilings, roofs and tall walls. Perfect the the DIY handyman, painting, HVAC, interior decorating, or general maintenance! Our Scaffold Towers are perfect for interior and exterior work.

Main Components:

Vertical tube, horizontal tube, oblique tube, stair, handrail, base, screw and other supporting components

Installation method of construction scaffold stair tower:

Operator: 3 persons

Step 1: place 4 adjustable bases on the ground where the safety ladder is scheduled to be installed according to the rectangular position of 2.44x1.27 meters. Adjust the nut to the uniform height of about 120mm.

Step 2: install 1 bottom door bracket at the entrance of the ladder, and insert the door bracket vertical bar into the adjustable base. Install 2 middle layer racks on the opposite side by the same method, and install the cross bar and inclined pull bar to connect and fix the bottom door bracket and middle layer bracket.

Step 3: install the "Z" ladder. The ladder starting platform is opposite to the door frame entrance of the ground floor.

Step 4: after installing the two-layer ladder, continue to install the middle layer frame, cross bar and inclined bar. Install one layer of ladder for each middle layer frame, and so on.

Step 5: when installing the last layer of ladder, install the top frame and guard rail (cross bar), and lay 2 pedals on the top platform. Note that the top door frame should face the construction subject.

Step 6: install the bridge pedal outside the outlet of the top floor bracket. One end of the bridge pedal is connected with the top floor bracket, the other side is connected with the construction body, and the handrails are installed on both sides of the bridge pedal.

Step 7: finally install the inner rails for all ladders. At this point, safety ladder installation is completed.

Safe And Convenient Scaffold Stair Access Towers , Ring - Lock Steel Scaffold Tower

Safe And Convenient Scaffold Stair Access Towers , Ring - Lock Steel Scaffold Tower

Send your message to this supplier
Send Now

Safe And Convenient Scaffold Stair Access Towers , Ring - Lock Steel Scaffold Tower

Ask Latest Price
Brand Name :
JN
Model Number :
Construction Scaffold Stair Tower
Certification :
CE ISO
Place of Origin :
Hebei, China
MOQ :
Negotiable
Price :
Negotiable
Contact Supplier
Safe And Convenient Scaffold Stair Access Towers , Ring - Lock Steel Scaffold Tower
Safe And Convenient Scaffold Stair Access Towers , Ring - Lock Steel Scaffold Tower

Gu an Jianneng Trading Co., Ltd

Active Member
7 Years
hebei, langfang
Since 2018
Business Type :
Manufacturer, Distributor/Wholesaler, Agent, Exporter, Trading Company, Seller
Total Annual :
3 million-5 million
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement