Specifications
Brand Name :
JN
Model Number :
JN-75
Certification :
CE ISO
Place of Origin :
Hebei, China
MOQ :
Negotiable
Price :
Negotiable
Payment Terms :
T/T, Western Union, L/C
Supply Ability :
5000m per month
Delivery Time :
within 7 days
Packaging Details :
Standard export package or as requested
Material :
Q235 Steel
Color :
Any color
Structure :
Combination Ladders
Surface treatment :
Galvanized / Zinc Plating
Application :
Highways, Railways,Bridges Construction
Unit Width :
1.2m or as requested
Description

Galvanized Zinc Plating Construction Scaffold Stair Tower With 1.2m Width

Description:

The construction scaffold stair tower has high strength, good overall stability, suitable width. So workers can freely stagger up and down and it is also very convenient to carry tools . It can better meet all kinds of safety construction needs.

Application:

It is widely used in construction of houses, Bridges, overpasses, tunnels, culverts, chimneys, water towers, DAMS , large-span scaffolds and many other projects.

Technical Parameter:

Model JN-75
Material Q235
Thickness of vertical tube (mm) 3.25
Thickness of horizontal tube (mm) 2.2
Thickness of oblique tube (mm) 1.5
Height each piece 3
Length each piece 2.5
Width each piece 1.2
Weight of each piece (KG) 75

Installation method of construction scaffold stair tower:

Operator: 3 persons

Step 1: place 4 adjustable bases on the ground where the safety ladder is scheduled to be installed according to the rectangular position of 2.44x1.27 meters. Adjust the nut to the uniform height of about 120mm.

Step 2: install 1 bottom door bracket at the entrance of the ladder, and insert the door bracket vertical bar into the adjustable base. Install 2 middle layer racks on the opposite side by the same method, and install the cross bar and inclined pull bar to connect and fix the bottom door bracket and middle layer bracket.

Step 3: install the "Z" ladder. The ladder starting platform is opposite to the door frame entrance of the ground floor.

Step 4: after installing the two-layer ladder, continue to install the middle layer frame, cross bar and inclined bar. Install one layer of ladder for each middle layer frame, and so on.

Step 5: when installing the last layer of ladder, install the top frame and guard rail (cross bar), and lay 2 pedals on the top platform. Note that the top door frame should face the construction subject.

Step 6: install the bridge pedal outside the outlet of the top floor bracket. One end of the bridge pedal is connected with the top floor bracket, the other side is connected with the construction body, and the handrails are installed on both sides of the bridge pedal.

Step 7: finally install the inner rails for all ladders. At this point, safety ladder installation is completed.

Galvanized Zinc Plating Stairwell Scaffold Tower , Cuplock Stair Tower With 1.2m Width

Galvanized Zinc Plating Stairwell Scaffold Tower , Cuplock Stair Tower With 1.2m Width

Galvanized Zinc Plating Stairwell Scaffold Tower , Cuplock Stair Tower With 1.2m Width

Send your message to this supplier
Send Now

Galvanized Zinc Plating Stairwell Scaffold Tower , Cuplock Stair Tower With 1.2m Width

Ask Latest Price
Brand Name :
JN
Model Number :
JN-75
Certification :
CE ISO
Place of Origin :
Hebei, China
MOQ :
Negotiable
Price :
Negotiable
Contact Supplier
Galvanized Zinc Plating Stairwell Scaffold Tower , Cuplock Stair Tower With 1.2m Width
Galvanized Zinc Plating Stairwell Scaffold Tower , Cuplock Stair Tower With 1.2m Width

Gu an Jianneng Trading Co., Ltd

Active Member
7 Years
hebei, langfang
Since 2018
Business Type :
Manufacturer, Distributor/Wholesaler, Agent, Exporter, Trading Company, Seller
Total Annual :
3 million-5 million
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement