Features
Red Mud Biogas Cover for Waste Water Treatment
Quick details of red mud biogas cover for waste water treatment
Item Name |
Red Mud Biogas Cover for Waste Water Treatment |
Model |
MDS1000 |
Material |
PVC Membrane |
Features |
Water-proof, Acid-resistant |
use |
Gas Storage and transportation |
Custom Desigh |
Welcome |
Form of sale |
Factory supply |
MOQ |
1set |
Thickness |
0.50mm-1.80mm |
Sample Lead Time |
10~25 Days |
Sample price |
According to the order capacity |
OEM,ODM |
Welcome |
Market |
All over the world |
Advantage |
OEM/ODM |
Payment Terms |
30% advance payment, the rest payment before delivery |
Advantages of red mud biogas cover for waste water treatment
Since 2006, we have 10 years′ experience of development, design, production, processing and application;
Excellent tensile, tearing, and adhesion strength;
- UV protection, antibacterial and anti-mildew, anti-fouling and anti-corrosion;
- High temperature and cold proof, aging resistance and durable;
- Surface treatment: acrylic or PVDF;
- Service life is more than 10 years;
- It can be used in biogas storage tank, biogas fermentation bag, biogas slurry storage bag, the tent of biogas slurry treatment factory.
Quality service and warranty of red mud biogas cover for waste water treatment
100% quality testing for every finished product before delivery;
Professional Aging testing room for aging testing time over 8 hours
Professional function testing for every process
One year warranty service for whole set equipment.
to repair the membrane for free within 3 years.
Delivery Service of red mud biogas cover for waste water treatment
- The product will leave factory within 15-30 days after receipt of your advance payment
- Export standard, safety and environmental packing Quick lead time for mass production.
- Accept EXW, FOB, CIF and other price terms
Pricing of red mud biogas cover for waste water treatment
Pricing varies depending on capacity required, operating pressure and gas production and utilization rates. Quotations are provided within 48 hours of request when accompanied by minimum required specification data.
Minimum specification data required in order to provide a quote:
- Required Gas Storage Capacity (m³)
- Operating Pressure (Kpa or mbar)
- Gas Production & Utilization rates (m³/hr)