Specifications
Usage :
Biogas storage
Warranty :
5 years
Features :
UV resistant, corrosion resistant, leak-proof
Application :
Storage And Utilization Of Biogas
Temperature Range :
-40°C to 60°C
Place of Origin :
China
Brand Name :
MDS
Certification :
CE, ISO9001:2015
MOQ :
1 set
Price :
Please contact us
Packaging Details :
Standard export wooden box
Delivery Time :
5~60 days
Payment Terms :
T/T, L/C, Western Union, MoneyGram
Supply Ability :
20 sets per month
Description

dual membrane gas balloon on digester

Brief introduction of dual membrane gas balloon on digester
The MDS dual membrane gas balloon on digester is a proven design to store digester gas with low total cost of ownership. The storage system is easier to install, has lower upfront capital costs and requires lower operating capital when compared to other methods of gas storage. The unique design allows for variable gas storage within the inner membrane at constant pressure during gas production and utilization, while the air inflated outer membrane provides gas pressure and protection. The outer membrane is constructed of a high tech cross woven fabric, coated with PVC and Ultraviolet (UV) ray protection, which has proven to endure the weather elements. An ultrasonic sensor is positioned at the center of the sphere to monitor the volume of gas present.


This gives the operators full control of optimizing the utilization of gas to feed generators and/or heating systems. Using the MDS dual membrane gas balloon on digester to store digester gas and eliminating or reducing 'flaming' from the digester(s) can help your facility reduce or completely eliminate the need for electric grid power when generators and/or hot water boilers are incorporated into the system/facility design.

Application of dual membrane gas balloon on digester
Livestock farm, Brewery wastewater treatment, Beer wastewater treatment plant, the paper mill wastewater treatment, urban sewage treatment, garbage disposal, food waste treatment, , Food wastewater treatment, crops’ waste treatment , food factory sewage treatment, etc.

Advantages of dual membrane gas balloon on digester

  • Lower Investment and maintenance costs

  • Easy Maintenance

  • Quick Installation within a few days on an existing foundation

  • Very high operating pressures

  • Large volumes

  • Suitable for highest snow and wind loads

  • Permanently gas-tight

  • High operational reliability

  • Exact level metering

Service and warranty of dual membrane gas balloon on digester
- Sales service time: 24 hours for one day, 6 days for one week to supply completely service for you any time.
- Warranty time: 12 months for complete set of equipment, free replacement for outer membrane and inner membrane within 3 years since customer receives equipment.

Delivery Service of dual membrane gas balloon on digester

  • Export standard, safety and environmental packing Quick lead time for mass production.

  • Accept EXW, FOB, CIF and other price terms

Send your message to this supplier
Send Now

Auto Control Dual Membrane Gas Balloon On Digester Quick Installation

Ask Latest Price
Watch Video
Usage :
Biogas storage
Warranty :
5 years
Features :
UV resistant, corrosion resistant, leak-proof
Application :
Storage And Utilization Of Biogas
Temperature Range :
-40°C to 60°C
Place of Origin :
China
Contact Supplier
video
Auto Control Dual Membrane Gas Balloon On Digester Quick Installation
Auto Control Dual Membrane Gas Balloon On Digester Quick Installation
Auto Control Dual Membrane Gas Balloon On Digester Quick Installation
Auto Control Dual Membrane Gas Balloon On Digester Quick Installation

Sichuan Mondes Green Technology Co.,Ltd

Verified Supplier
1 Years
sichuan, chengdu
Since 2015
Business Type :
Manufacturer, Trading Company
Total Annual :
10 million-15 million
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement