Conference Flat Panel Multi-functional Touch Panel All-in-One
Conference all-in-one machine is a kind of intelligent office equipment integrated with a variety of functions, designed for meeting, conference all-in-one machine collection of wireless screen casting, electronic whiteboard, high-definition display, video conferencing terminals, cameras, interactive collaboration, intelligent AI and other functions as one of the office equipment, also known as the conference flat panel, intelligent conference all-in-one, teaching all-in-one, intelligent whiteboard and so on.
Our Advantages
junnan all-in-one conference machine intelligent positioning remote control/center control/hand control, easy and convenient to operate. lifting and adjustingHigh degree of freedom and controllability, the all-in-one conference machine lifting and lowering distance can be freely adjusted.Stable Motor Control,Various Controls And Convenient OperationBuilt-In Low Noise,Escalate Meeting,Simple and convenient wireless link,Create high-end and efficient meetings,Beautiful And Space-Saving,We are advanced all-in-one conference machine, easy to maintain, available for wholesale purchase and private customization.
Junnan All-In-One Conference Machine Parts Description
Junnan Conference All-in-One Application Scenario
junnan Ceiling TV flipper parameters
Screen Size | 65 Inches | 75 Inches | 86 Inches | 98 Inches | 110 Inches |
length Width | 1486*921*89.1MM | 1708*1046.3*89.1MM | 1954*1185*89.1MM | 2218.2*1338*100.8MM | 2502*1498.7*103MM |
Package Size | 1600*205*1001.5MM | 1846*215*1180MM | 2092*215*1319MM | 2357*1478*215MM | 2680*270*1655mm |
Application areas | S25m2 | 20-40m2 | 40-60m2 | 60-80m2 | Above 80m2 |
Applicable numberof people | 1-5 people | ≤10 people | ≤25 people | ≤35 people | ≤45 people |
net weight | 37.2Kg | 54Kg | 65.8Kg | 89.5Kg | 100Kg |
FAQ
How many days you need to install the equipment?
Re:The installation time depends on the type and quantity of equipment. The fastest is 1 day, and the longest is three or four days.
Can I transfer the money to you then you pay to other supplier?
Re:No problem, I can do it for you
When will you leave your factory and to have your spring festival holidays?
Re:Our Spring Festival holiday is usually 15-20 days during January and February
Can you send your staff to install the equipment for us?
Re:We can send technicians to install it, but you need to pay the travel and labor costs.
Can I only buy some spare parts from you?
Re:sure