FSM390~FSM400M72L (390W/395W/400W) 72*9BB Cells Typical Mono PERC Solar Panels
Electrical Characteristics under STC
Module Type | FSM390M72L | FSM395M72L | FSM400M72L |
Maximum Power-Pmax (Wp) | 390 | 395 | 400 |
Voltage at Maximum Power-Vmp (V) | 41.1 | 41.4 | 41.7 |
Current at Maximum Power-Imp (A) | 9.49 | 9.55 | 9.60 |
Open Circuit Voltage-Voc (V) | 49.3 | 49.5 | 49.8 |
Short Circuit Voltage-Isc (A) | 10.12 | 10.23 | 10.36 |
Module Efficiency-ηm (%) | 19.7% | 19.9% | 20.2% |
Operating Temperature | -40℃ to +85℃ | ||
Maximum System Voltage | 1000V/1500V DC (IEC) | ||
Power Tolerance | 0~+4.99W | ||
Temperature Coefficients of Pmax | -0.350%/℃ | ||
Temperature Coefficients of Voc | -0.270%/℃ | ||
Temperature Coefficients of Isc | +0.048%/℃ |
Mechanical Characteristics
Cell Type | G1 MONO PERC 158.75×158.75mm |
No. of Cells | 72 (6×12) |
Dimension | 1979×1002×35mm |
Weight | 22 Kg |
Junction Box | IP68, 3*20A diodes |
Output Cables | 4.0mm², 1100mm Length (Optional) |
Connectors | MC4 compatible |
Packing | 31PCS/Pallet, 748PCS/40’HC |
Key Features
Production Descriptions
FINERGY made large investments on automatic equipment and production lines since 2016. The cells soldering and string are completed by automatic high speed soldering machines. Then, the robots put the strings on glass as type setting. Automatic mechanical transfer of materials to eliminate damage and human errors. There're 3 channels of EL detections and final power test in the whole process to save waste and ensure high quality.
QC Inspections
Besides EL detections and power test on production, the QC staffs of FINERGY company also take 4 times of visual inspections. Each qualified panel has to be QC PASS sealed in red on the backsheet. We promise each product to customers is perfect.
Standards
FINERGY factory is ISO9001, ISO14001 and OHSAS18001 approved. The production processes follow strictly with IEC61215 and IEC61730 standards. Besides these, the ISO and TUV organizations take factory period inspections once a year.
Automatic Equipment and Advanced Production Line
QC Inspection