Auto Brake Parts Mazda 3 / 5 / Premacy (2003-) BP4Y3325XB / C24Y3325XC
Product Description
Model No | DBQ2001 |
OE NO / (Part number) | C24Y3325XC / 1C24Y3325XC9A / 1BP4Y3325XD / 1BP4Y3325XC / BP4Y3325XB / C24Y3325XD / C24Y3325XB / 0986479179 / 0986479438 / 986479179 / 9946424 / 8DD355110871 |
Used for | MAZDA 3 1.4L 1.6L 2.0L 2.2L 2.3L 2.5L (2003-) / 5 1.6L 1.8L 2.0L 2.3L (2005-) / PREMACY 2.0L (2005-) |
Test capability | Abrasion resistance,OK. |
Power | Strong durability |
Inspection | 100% inspection |
warranty | 12 Months / 10000 km |
Brake disc processing technology
Brake disc commonly used materials for China's gray cast iron 250 standard, referred to as HT250. Main chemical composition
For: C (3.1-3.4), Si (1.9-2.3), Mn (0.6-0.9), hardness requirements between 187-241.
Brake disc blanks are cast and heat treated to improve the internal stress generated during casting.
Deformation, cracking phenomenon, improve the machinability of castings. After screening, will meet the requirements of the blank pieces into
Line machining. The process is as follows:
1, rough car large round surface
2, rough in the hole
3, rough car small round face, side and right side of the brake surface
4, rough car left brake surface and the hole
5, semi-fine car large round surface, the left side of the brake surface and the hole
6, semi-fine car small round face, face, in the right and the right side of the brake surface
7, fine car slot and the right side of the brake surface
8, fine car left brake surface and small round face, fine left side of the bottom round, the hole chamfer
9, drilling to deburring, blowing iron scrap
10, packaging storage
Advantage
1, we use high-quality HT250 raw materials for customers to produce high-quality brake discs, can also be customized according to customer requirements for production, to meet the requirements of different customers.
2, disc brake has a good heat dissipation performance, not because of high-speed brake and production
Heat shock recession; In addition, the disc brake will not be due to continuous brakes caused by brake failure phenomenon, to ensure safe driving; disc brake drum drum structure is simple, easy maintenance.
3, we use advanced automation technology to ensure that the product in the production process of consistency and high quality.
4, we provide customers with personalized custom packaging, neutral packaging and other services. satisfy customer's request.
5, we have fully automated production equipment, can carry out 100,000 brake discs per month to meet customer demand for production capacity.
6, when we receive the customer's order, will immediately check the inventory and arrange the production plan, in the production is completed, the timely delivery arrangements.
7, we give you the price is the industry's lowest, the quality of the product and our service is the best.
8, we provide customers with comprehensive services, from consulting to customers receive goods and warranty services.
9, our product quality, to provide customers with 1 year or 10,000 km warranty period long service.
FAQ (Fluently Asked Questions)
Q1. Can you produce according to the samples?
1, Yes,we can offer a sample,also for some items,the sample is free,for others,not. It depends.Please feel free to contact us for more information about the sample.
And buyers should pay for the shipping fee.
Q2. What is your sample policy?
1, We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q3. Do you test all your goods before delivery?
1, Yes, we have 100% test before delivery.
Q4. What is your terms of payment?
1, T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q5. What is your terms of delivery?
1, EXW, FOB, CFR, CIF, DDU.
Q6. I want to buy your products, how can I pay?
1, Through bank transfer,we'll show the account information on PI.
2, Others:We can make specifications according to customer's requirement.
Q7. How about your delivery time?
1, Generally, it will take 3 to 35 days after receiving your advance payment. The specific delivery time depends on the item's inventory and the quantity of your order.