Crosshead Pin , Mud Pump Crossdead AH1301020403 RGF1000-04.10 RS11308A.04.014 GH3101-04.10 GH3161-04.13
Installing of Crosshead
1) Thoroughly clean all dirt or contamination and remove all burrs or rough edges from OD of the crosshead, crosshead pin bores, and inner bore of crosshead guide. Dry crosshead pin bore so taper bore connection will make up metal to metal See Note.
2) Position “eye” of eccentric at the opening in the side of the crosshead guide. Block eccentric strap so that crosshead will clear the “eye” as it is sliding into position to where the crosshead pin holes are in alignment. Refer. Fig 20.
3) Install the left hand crosshead first, rotate crankshaft assembly to make “eye” into center crosshead and right hand eccentric strap “eye” back, take down mud guard (1 in Fig.21), and push right crosshead to the frame for enough space to install Mid-crosshead and then right crosshead.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 |
|
HRSB | RSF-1300 | RSF-1600 |
| |||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 |
| |||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L |
|
|
|
|
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 |
|
|
|
|
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 |
|
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT |
|
|
|
|
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 |
|
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 |
|
|
|
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
|
|
|
|
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
More customer view:6-TSCmudpumpparts1-yindapump.com.pdf