Crosshead Guide (Lower), Mud Pump Crosshead AH36001-04.17 RS11308.04.009 RGF1000-04.12 GH3161-04.15(G)
Crosshead Guide (Lower), Mud Pump Crosshead AH36001-04.17 was used in Mud Pump corsshead.
The crosshead and mud pump crosshead guide plates are made of ASTM a48-83 cast iron with good wear resistance and long service life. and the concentricity can be adjusted by adding gaskets at the lower guide plate.crosshead and the middle tie rod between the pin hole with flange bolt connection.This rigid connection method ensures the concentricity between the middle tie rod and the crosshead.
Description:Guide Plate is the main accessories in mud pump fluid end system. It use 35CrMo.forged by the processing. Our company produces high precision nickel-plated, with good wear resistance and corrosion resistance also.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 |
|
HRSB | RSF-1300 | RSF-1600 |
| |||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 |
| |||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L |
|
|
|
|
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 |
|
|
|
|
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 |
|
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT |
|
|
|
|
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 |
|
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 |
|
|
|
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
|
|
|
|
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
More customer view:97-TSC WF1300C PUMP-yindapump.com.pdf