Valve Pot Cover, Mud Pump Fluid End AH36001-05.14A RS11309A.05.012 GH3161-05.13 RGF1000-05.11 GH3101-05.11
Valve Pot Cover, was used in Mud Pump Fluid End.
Mud pump valve pot cover is mounted on the top of the cylinder and used to centre and position discharge valve. The blank of valve cover is forged by 35CrMo. The valve cover is assembled with valve box to ensure the seal and fixation of the water outlet system with the blind hole at the bottom.
Whether onshore or offshore, well drilling sites are highly complex work environments that rely on numerous systems to successfully perform the drilling operation. Among these systems, the rig’s mud pump is tasked with circulating drilling fluid (mud) under high pressure (up to 7,500 psi) downhole.
Our Services
1. 24 hour on-line prompt reply to your inquiry.
2. Competitive price for quality-guaranteed product
3. Professional inspection department to guarantee quality
4. Fast delivery of Purchase order.
5. Reliable after-sale servic
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 |
|
HRSB | RSF-1300 | RSF-1600 |
| |||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 |
| |||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L |
|
|
|
|
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 |
|
|
|
|
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 |
|
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT |
|
|
|
|
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 |
|
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 |
|
|
|
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
|
|
|
|
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
More customer view:45-emscof800.htm-yindapump.com.pdf