Low Cost Simple Skeleton Single Span Tunnel Agriculture Greenhouse
Advantage
The structure is simple and easy to install, and the greenhouse area is small, which is conducive to mechanical operations and enhances land use capacity.
Use
The greenhouse area is small, which can meet the requirements of individual management of the customer's requirements. The greenhouse can be configured with a single planting environment with low cost and easy management.Can be used for nursery, flower farming, vegetable planting or garden vegetable planting.
Skeleton

Detail


Use Show


Delivery
Delivery |
Delivery Details | Way:Sea or land transport Time:According to the current production line and the greenhouse area arrangement, the normal 800-2000 sqm. greenhouse production time is 30 working days. (Please consult us for the specific time) |
FAQ
1. How long is the service life of this greenhouse?
Under normal maintenance, the service life of the greenhouse is 8-10 years;
2. Can I get samples for testing?
Of course, free parts can be send to you for your test,you only need pay the transport cost.If you need sample,please contact us.
3. What information do I provide before I get a quote?
We will understand the customer's request for the greenhouse before the offer, so the information provided by the customer is of the utmost importance. In order to speed up the offer, you can prepare the following information in advance:
--Greenhouse type(Glass,PC Sheet,Plastic Film,Multi-span,Single- Span,etc.)
--Ground Size or greenhouse quantity.(Length,Width)
--Temperature in your side(Summer,Winter)
--The system that you want(Please choice on the Option System)
4. Can you design a greenhouse according to my request?
Yes,just tell us your ideas and we will help to carry out your ideas into perfect products.
5. How do I get drawings?
After you confirm the order, we will prepare the drawings and materials, sent to you to confirm. If you have any other questions, please contact us.
6. What about the production time ?
Honestly,it depends on the order quantity and the season you place the order.The lead time of MOQ is about 30 to 35 days.Generally speaking,we suggest that you ensure order one month before the date you would like to finish the production .