Specifications
Model NO. :
12V. 16.20E/ ZCK150S840
Application :
190 Engines
Brand :
Jichai,Chidong,Shengdong
Transport Package :
Exported Standard Package
Trademark :
Jinan jichai/ China
Origin :
Jinan, China
HS Code :
8409911000
Supply Ability :
35000 Pieces/Year
Conditions of Use :
Generator
Usage :
Generator/ Engine
Output Type :
AC Three Phase
Cooling Method :
Water Cooling
Installation Method :
Fixed
Generator Type :
Diesel Generator
Customization :
Available | Customized Request
Place of Origin :
china
Certification :
ISO9001
MOQ :
1
Price :
10-1000
Packaging Details :
Wooden box and carton packaging
Delivery Time :
15 days
Payment Terms :
TT,western
Description
The main reasons for the fuel injection nozzle jamming.

1 Diesel fuel is not clean, impurities in the high-pressure oil pipe, so that the needle valve coupling is not closed tightly, the combustion chamber in the high-pressure gas rebound, burned needle valve coupling. In addition, the injector regulator spring, tappet and other parts of the dirt through the injector tappet moved to the upper part of the injector needle valve, or oil road used to prevent oil leakage of cotton rope, lead wire through the high-pressure oil pipe into the injector, will make the needle valve coupling jammed.

2 The machine temperature is too high injector cooling is poor, resulting in the oil valve coupling stuck.

3 The oil valve wear, so that when the injector stops spraying oil drip phenomenon, so that the injector nozzle burning coke accumulation, the occurrence of jammed failure.

4 Injector installation, omission of gaskets or gasket damage, resulting in air leakage, causing the injector local temperature is too high and stuck.

5 The injection pressure is too low, resulting in the combustion chamber of high-pressure gas backflow.

6 Parts manufacturing reasons, such as cylinder head injector mounting holes and injectors with too tight, needle valve body and cylinder head mounting hole clearance is too small, cylinder head injector mounting hole processing too deep.

Product Description


Injection nozzle stuck repair method.

First, the stuck injector into the diesel or oil warming, and then remove the cloth wrapped, and then clamp the needle valve with hand pliers and slowly move, the needle valve from the needle valve body out. A small amount of clean oil drops in the body of the needle valve, so that the needle valve in the body of the needle valve repeated activities, until the needle valve can move freely in the body of the needle valve. If the sealing surface of the needle valve has traces of burns, it should be ground with abrasive paste. When grinding, pay attention to grasp the amount of grinding paste and grinding time. The cleaned bell valve coupling will be installed on the injector, and adjust the injection pressure can be used again.

No. Part Number Description
1 12VB.16.01 Cap
2 12V.16.02 Washer
3 12V.16.03 Lock nut
4 12VB.16.04 Pressure adjusting screw
5 12VB.16.05 Upper spring seat
6 12V.16.06A Pressure adjusting spring
7 12VB.16.10 Tappet subassembly
Daily maintenance parts include: spark plugs, magneto, ignition coils, high voltage cables, etc., cylinder liners, ignition coils, pistons, piston rings, air filter, oil filter, diesel filter, intake valves, exhaust valves, valve seats, motors, cylinder heads, exhaust pipes, various gaskets and screws, bellows, bodies, crankshafts, camshafts, intercoolers, superchargers, connecting rod tiles, shaft tiles, STITT spark plugs, MOTORTECH spark plugs, pre-ignition chamber spark plugs, four-pack etc.
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
Export Case
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
Detailed Photos
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
Certifications

190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e

Our Advantages
1.Passed ISO9001 quality system certification and ISO14001 environmental system certification.
2.The company has entered into in-depth cooperation with equipment research institutes and advanced equipment manufacturers.
3.Applications: enterprises with gas sources such as biogas, industrial tail gas, gas, natural gas, gas, tyre cracking gas, biomass gas, etc.
4.The business covers the sale, rental and maintenance of generating sets, power station construction and cooperative power generation
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
























Send your message to this supplier
Send Now

190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e

Ask Latest Price
Model NO. :
12V. 16.20E/ ZCK150S840
Application :
190 Engines
Brand :
Jichai,Chidong,Shengdong
Transport Package :
Exported Standard Package
Trademark :
Jinan jichai/ China
Origin :
Jinan, China
Contact Supplier
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e
190 Engines Jinan Jichai Generator Parts Fuel Injection Nozzle Couple 12V. 16.20e

Jinan Guohua Green Power Equipment Co., Ltd.

Verified Supplier
2 Years
shandong, jinan
Since 2010
Business Type :
Manufacturer, Trading Company
Total Annual :
3000000-4000000
Employee Number :
100~110
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement