Automatic Metal Stud Track Steel Gauge Frame Making Machine Galvanized Vineyard Posts Grape Stake Roll Forming Machine

Specifications of Automatic Metal Stud Track Steel Gauge Frame Making Machine Galvanized Vineyard Posts Grape Stake Roll Forming Machine
1. | Power requirement | Type | 380v/3ph/50hz | |
| | Main Motor power | 5.5kw | |
| | Cutter power | 5.5kw+2.3kw | |
2. | Forming speed(m/min) | 0-30m/min max | Not include the time of cutting |
3. | Forming stations | 12 stations | |
5. | Material of rollers | CR12 | |
6. | Thickness of structure | 30mm | |
7 | Forming shaft diameter(mm) | 70 | |
8 | Drive | Gear box | |
9 | Type of cutting | Hydraulic cutting | |
10. | Control system | PLC xinjie | |
11. | Install dimension(depend on the final design) | 4.8m×0.6m×1.2m | Without panel length |
12. | Total weight (Approx) | 2.3T | Depend on final design |
13. | Screen | Text screen /touch screen | |
Photo for Automatic Metal Stud Track Steel Gauge Frame Making Machine Galvanized Vineyard Posts Grape Stake Roll Forming Machine 





ABOUT US:

More Products for Your Choose:

FAQ:
1. How long the machine could be made?- Normally speaking, light gauge steel frame machine could
be made within 45 working days. If you need machines in a hurry, we can make it for you
less than a month.
2. How to visit your company?
-a.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5
hours), then we can
pick up you.
3. Do you have after sales support?
-Yes, we are happy to give advice and we also have skilled technicians available across the
world.We need your machines running in order to keep your business running.