100m3/h Container type PSA nitrogen generator Pipeline Nitrogen Filling usage 99.9% purity
TRUE nitrogen generator function:
1, Strict air treatment system
2, Unique low-speed diverter and non-friction soft compaction device
3, durable pneumatic valve
4, low-noise silencer of innovative design
5, unique touch switch and LCD in the nitrogen industry; Data can be modified arbitrarily
6, of high automation and can be duty-free
7, of reasonable and compact structure
8, efficient nitrogen-making in short period
Technical advantages of filling the molecular sieve
The following two diagrams are the density of the storm loading method and the aging frequency modulation filling method (Tong Yue), which show the technical advantages of Tong Yue.
Application in oil-gas territory
Now, nitrogen gas has been used widely in gas drilling of the oil-gas well, three times oil production operations, well completion, well repair, pressure upkeep and gas storage. And the inertia of nitrogen and the high pressured nitrogen can be in collecting gas and the sweep of piping system to prevent inflammable gas burning and the underground pipes of oil field being corroded.
GAS Drilling
Improve the Penetration Rate
Reduce or Avoid Leakage
Extend the Service Life of Drill
Decrease the Complex Hole Problems
Reduce Completions and Stimulations
Protect and Found Producing Formulation
Blowing and Cleaning of Pipes
Pipeline Pressure Test and Cleaning, Blowing
Pipeline Nitrogen Filling
Blowing and Cleaning Flammable Liquid, Gas Container and Pipes
Replacements and First aid Repair of Pipes and Containers
Use the Inactive Feature of Nitrogen to Seal Leakage and Prevent the Harmful Leakage into the Air of Dangerous Material
Others
Methane Regeneration on the Coal Seam
Natural Gas Gathering Station
LNG Accepting Station
Ocean Drilling Production Platform
Gas Evolution Factory
Delivery of technical documentation
Serial number | Delivery items | Quantity | Delivery time |
1 | Equipment process flow chart | 2copies |
15 days after the received 30% advanced payment |
2 | Site layout | 2copies | 15 days after the received 30% advanced payment |
3 | Mechanical assembly drawing | 2copies | 15 days after the received 30% advanced payment |
4 | Outline size chart | 2 copies | 15 days after the received 30% advanced payment |
5 | Electrical principle chart | 2 copies | 15 days after the received 30% advanced payment |
6 | Electrical wiring diagram | 2 copies | 15 days after the received 30% advanced payment |
7 | service instructions | 1 copy | supplied with the machine |
8 | technical documentation of pressure vessel | 1 copy | supplied with the machine |
9 | spare parts list | 1 copy | supplied with the machine |
10 | packing list | 1 copy | supplied with the machine |
11 | Certificate of qualification | 1 copy | supplied with the machine |