The High Efficiency Commercial Fried Noodle Machine Production Line
Description
The high efficiency commercial fried noodle production line of BFP-Y is the production of new generation which developed by our company based on similar productions from overseas and domestic market. It has high technology, compact structure, original design and stable performance. It is highly automatic, convenient (operation), low energy consumption and less space occupation, invest on this line is only 10% of cost on large processing line, all these features assures this line is very suitable to self-owned enterprises.
Our main concern is to satisfy the needs of our customers at all times. This policy has made our company strive for innovation, quality and efficiency. An international vision and more than twenty years' experience ensure we have enough abilities to add more value to customers.
Instant noodle production line:
1. Flour storage
2. Flour lifting
3. Flour measuring
4. Flour mixing
5. Alkali mixing and measuring
6. Ripening
7. Compound pressing
8. Curing
9. Continuous pressing
10. Shaping
11. Steaming
12. Cutting
13. Dividing
14. Fried
15.Cooling
16.Conveyor
17. Packing
18. Lifter
· Modularized design,integral structure,easy to assemble and operate.
· The whole line is managed by advanced controlling theory with high-performance PLC and speed driver.Stable performance and high level of automation.
· High-precision digital processing ensures the mechanical performance attains the best within the scope of design.
· The cover and the bucket are made of stainless steel,which meets up with the standards of food sanitation and makes the whole machine beautiful,clean and easy
Feature:
Available Capacity: 30,000-200,000bags/8hr
Noodle Breadth: 320mm-870mm
Total Power: 55(KW)-137(KW)
Noodle weight: 55-90(g)
Sream Consumption: 1500kg/h-2800kg/h
Style: Frying instant noodle & Drying instant noodle
After-sales Service Provided: Engineer available to service machinery overseas.
How to use:
1. Please read the introductions and specifications of the machine before operation.
2. Please don’t leave the machine in its working time, and keep children away from the machine.
3. It’s forbidden to clean the main engine of the machine with water before or after operating, and avoid the water on the machine thus to prevent leakage of the electricity; IF you will clean the machine, please switch off the power firstly and clear it with dry cloth except for the main engine.
4. If you won’t use it for a long time, please put the machine in dry and ventilate place in case it is affected with damp and mouldy.