Commercial Non-Fresh Noodle Production Line High Efficiency
Production description:
The Non-fried instant noodles production line of BFP-H series adopts advanced technologies and is of high automation, safety and easy maintenance.
Its capacity from 2.5ton- 12ton wheat flour consumption/8hours one shift. And the noodle cake weight from 45g to 120g. Different capacity,different price.
Automatic noodle production line on the basis of the research of similar products at home and abroad, combined with the needs of the mass consumer market in China, with miniaturization the production features a new generation of products developed and manufactured by its technology to improve, compact design novel, stable and reliable performance, production from flour to finished product once complete, the high degree of automation, simple operation, moderate, production, energy saving.
The Non-Fried Noodle Production Of Line:
1. Alkali measuring and mixing tank
2. Double speed flour mixing machine
3. Disc type feeder
4. Compound & continous presser
5. Single layer steamer
6. Cutting& folding machine
7. Frying and drier
8. Cooler
9. Conveyer
10. Finished product conveyer
11. Electrical system
Product Features&Advantage:
1. Lifting noodles automatically, less labor.
2. Perfect function of speed cutting help saving the energy cost.
3. Chain delivery brings you repairment more easily.
4. Stainless steel sheet roller and sheeting, clean and healthy
5. High efficiency and safety
6. Suitable for middle pattern customers for noodle making
7. The roller can be changed, it can produce varies of noodles as your request.
8. Directly put the dough into the feeding port;
9. Forming the sheet and noodle at one time;
10. Transfer the noodles automatically,cutting and hanging by itself;
11. Two cutters free together with the automatic noodle making machine;
12. One bundle of rods for hanging the noodles sent free together with noodle making machine;
Our Servise:
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply,gas power, material storage, final storage, worker’s restroom, etc.
2. After receiving firm order and down payment, we start to apply for the Visa to your country immediately; while the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. Our engineers can provide basic formula for the production, and help the customer to produce good quality food according customer’s detailed formula.
6. It normally costs 10-14 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.