Specifications
Brand Name :
KYE
Model Number :
OEM
Certification :
ISO9001:ISO14001
Place of Origin :
China
MOQ :
1 set
Price :
To Be Negotiation
Payment Terms :
T/T
Supply Ability :
50 Sets Mould Per Month
Delivery Time :
30 working days
Packaging Details :
Wooden Case With Steel Frame
Part Mateiral :
A380/ADC12/A356/ADC12
Mold type :
2 plate-mold
Useage :
Watch frame
Mold material :
1.2344/H13/738H
Mold base material :
S50C LKM, DME, LKM & HASCO & DME, HASCO, LKM Mould Base
Part surface :
A1 polishing with Chrome
Product material :
Aluminium,Plastic,Steel,Metal
Material :
Aluminum,Steel,Zinc Alloy,Aluminium /copper/steel board etc,H13/Diver
Description

A1 Polishing H13 738H Aluminum Casting Molds For Watch Frame

For injection molding, molds and injection molding machines have a great impact on the quality of molded products. It can even be said that molds play a greater role than injection molding machines. If you do not fully understand the mold during injection molding, it is difficult to obtain Excellent molded product.

Product Details Description

Plastic materials Aluminum A380/ADC12/A356/ADC12, zinc...Metal...etc.
Mould Base Material LKM, FUTA, HASCO, DME, etc. or as per customer’s requirement.
Size According to your drawing
Mould Base S50C HASCO standard, European standard, World standard
Quality ROSH and SGS standard
Surface Finishing Texture (MT standard), high gloss polishing
Cavity / Core material P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc.
Cavity Number Single cavity, Muti Cavity, based on customer’s requirement.
Design & Program Softwares CAD, CAM, CAE, Pro-E, Solid works…etc.
Mold building lead time 30~50 days after mold 3D approved, parts measurement report (upon required).
Annual production 300-400 sets of mold
Mould Base S50C HASCO standard, European standard, World standard
Surface Finishing Texture, high gloss polishing,powder coating,laser cutting, Chrome, electro-plating
Cavity / Core material P20, 2311, H13, 2344, Starvax 420, 236,AdC3, S136, 2312, 2379, 2316, 2083, Nak80, 2767 etc.
Cavity Number Single cavity, Muti Cavity, based on customer’s requirement.
Design & Program Softwares CAD, CAM, CAE, Pro-E, Solid works…etc.
Mold building lead time 30~50 days after mold 3D approved, parts measurement report (upon required).

Watch Frame 2 Plate Die Casting Mould LKM HASCO Material

OUR ADVANTAGE

Quickly reply

Our sales team can reply you on time, usually we feedback less than 12 hours, and offer the quotation less than 24 hours with simple product, complex products usually less than 48 hours.

Professional solution service

Base on your quantity requst, our engineer can give you the professional advise, for example if new product for testing the market, so we usually advise you to select the short mold life with cheap cost. But big batch product molds, our engineer will advise you to use hard steel for long mold life.

Complex product

Our engineer can do the 2K molds, gear molds, over molding molds, unthreading molds, many slide undercut undercuts molds, pline moving sliders molds etc, they are famillar with the Hasco, DME, LKM etc export molds standard, and also famillar with the hot runner, INCOE, YUDO, MOLD master etc.

Quality control

Our engineer can control the product quality with their professional technology, they check the molds one step by one step before shipping to keep the molds can be running smoothly after shipping to the customer facotry, they also check the product quality with professional experience also with many QC form to work.

Project process

Quote According to sample, drawing and specific requirement.
Discussion Mold material, price, payment, etc.
Advance Payment by proforma invoice.
Product Design Checking We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report.
Mold Tooling We start to make mold after mold design confirmed.
Mold Processing Send report to customer once each week.
Mold Testing Send trial samples to customer for confirmation.
Mold Modification According to customer’s feedback.
Delivery Delivery by sea or air. The forwarder can be designated by your side.

FAQ

Q1: Are you trading company or factory?
A: We are factory.

Q2: My components have already been developed on CAD. Can you use the drawings?
A. Yes! DWG, DXF, IGES, Solidworks and Rhino files can all be used to generate quotes, models and mould tools - this can save time and money in producing your parts.


Q3:Can I test my idea/component before committing to mould tool manufacture?
A. Yes, we can use CAD drawings to make models for design and functional evaluations.


Q4: What type of plastic is best for my design/component?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.


Q5: What type of mould tool do I need?
A. Mould tools can be either single cavity (one part at a time) or multi-cavity (2, 4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10, 000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend which would be best for you.


Q6: Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A. It can take 3-6 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.

Quality Assurance is the key to success for KYE Moulds, high-quality/defect free products is the reason KYE enjoys repeat business from our list of satisfied customers.We use high precision measurement tools and advanced video devices to check all parts and processes from incoming material till outgoing final inspection, to ensure only qualified products will be sent out to our customers.Thanks for the visit and looking for the inquiry!

Send your message to this supplier
Send Now

Watch Frame 2 Plate Die Casting Mould LKM HASCO Material

Ask Latest Price
Brand Name :
KYE
Model Number :
OEM
Certification :
ISO9001:ISO14001
Place of Origin :
China
MOQ :
1 set
Price :
To Be Negotiation
Contact Supplier
Watch Frame 2 Plate Die Casting Mould LKM HASCO Material

KYE Mould Techenology Limited

Site Member
6 Years
Since 2008
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter
Total Annual :
2 Million-3 Million
Employee Number :
50~80
Certification Level :
Site Member
Contact Supplier
Submit Requirement