A3 13" 150 Micron Laminator One Minute Warm-Up Quick Laminator Machine Thermal Laminator Machine
This A3 Thermal Laminator machine is popular in the Korean and Japanese markets. It could laminate 100micron and 150mic perfectly. It is designed with the latest NTC technology, the temperature tolerance of which is merely 2 degrees celsius.
Features:
- Instant Ready: only One minute / 60 seconds warm-up
- 350mm/min, 14" per minute rapid laminating speed
- Excellent 2-roller NTC design for 75mic ~ 150mic photo lamination
- Professional Thermal Laminator machine for 150micron / 7mil thermal laminating sheets
Description | 13" A3 10 Mil Laminating Machine For Photos Professional Laminator One Minute Warm-Up |
Model | LM341A |
MAX. LAMINATING WIDTH | A3 / 330 mm |
THICKNESS SELECTION | 75~250 micron / 3~10 mil |
WORK INDICATION LAMP | YES |
COLD LAMINATING | YES |
ROLLERS | 4 ROLLERS |
WARM-UP TIME | 60 seconds / one minute warm up time |
MAX. LAMINATING SPEED (50HZ) | 300 mm/min 12inches /min |
POWER | 1300W |
AUTOMATIC SHUT OFF | YES 90 minutes |
MOQ | 500pcs |
AUTOMATIC THICKNESS MEASURING | NO |
CERTIFICATE | CE, GS UL |
JAM RECOVERY | Motor Reverse |
EXIT TRAY | NO |
PCS/CARTON | 4 |
NET WEIGHT | 4.50 kg |
DIMENSIONS | 550 x 170 x 100 mm |



Q: What’s your MOQ?
A: We expect a minimum order value of US$10,000 and you can order mixed items. If you require your private color box design, we’ll ask for a higher MOQ depending on the specific item.
Q: What’s your delivery time?
A: We can complete production within 35 – 60 days depending on the specific item and your packaging requirement.
Q: Where do you ship the goods?
A: We mainly ship from Shenzhen port. If you want us to ship the goods from Ningbo or Shanghai, we will charge the extra inland shipping costs.
Q: Can you produce my order with my customized OEM color box?
A: Yes, we accept OEM orders with your private brand and color box, as long as your order quantity is over MOQ.
Q: Do you offer exclusive distributorship?
A: Our business relationship comes in 3 levels: Open(non-exclusive, non-binding), Priority and Exclusive. Such relationship is a bilateral commitment with reciprocal rights and duties.
Q: What talents do you have access to in terms of new product development?
A: Our role is about new product planner, project controller and master investor. We outsource industrial design with a top design agency in Shenzhen. We work closely with our manufacturing partner’s mechanical engineers, E & E engineers,and software programmers.
Q: How long does it take for you to develop a new product?
A: 2 to 10 months depending on the specific project.
Q: What’s your warranty for office machines?
A: We offer a warranty of 12 months after customers receive the goods in their warehouse.
Q: Do you provide free spare parts?
A: Yes, when customers order our machines in volumes, we provide some free spare parts with the shipment.
Q: Is your factory ISO certified?
A: Yes. We passed the ISO9001:2015
Q: Does your factory pass the BSCI audit?
A: Yes. We passed the BSCI audit, and got grade C.
Q: Does your factory pass 3rd party audit?
A: Yes. Our customers have appointed 3rd party to conduct the regular audits at our factory.