Environment protection and fully automatic electric heating hot water boiler
Electric hot water pot hundred furnaces equipped with hot water boiler special computer controller, the use of modern computer control technology, the pot furnace performance of intelligent, automated, humanized into reality, with high stability, rich function, simple operation, easy to use, flexible control and other advantages. Powerful, with boiler water temperature control (see the following channel), boiler water level display, water shortage protection, super-temperature protection, built-in digital back clock, continuous or timing (4 time period) operation control and many other automatic display, control functions.
Part of product parameters
CWDR0.7-95/70
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 0.7 | |
2 | Water volume | M³ | 1.4 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 99 | |
5 | Output/inlet diameter | mm | DN100 | |
6 | Design fuels | / | Electric | |
7 | Blow down valve diameter | mm | DN100 | |
8 | Heating area(room) | ㎡ | 6000 | |
9 | Hot water output | M³/h | 18 | |
10 | Bulk size | mm | 2400×1200×1800 |
CWDR1.4-95/70
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 1.4 | |
2 | Water volume | M³ | 3.75 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 99 | |
5 | Output/inlet diameter | mm | DN125 | |
6 | Design fuels | / | Electric | |
7 | Blow down valve diameter | mm | DN125 | |
8 | Heating area(room) | ㎡ | 12500 | |
9 | Hot water output | M³/h | 36 | |
10 | Bulk size | mm | 2800×1700×2300 |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1.provide full range of original spare parts.
2.Engineers abroad installation and commissioning service is
available.
3.Our engineers will held a training for boiler workers to
ensure the safe operation.
4.Free maintenance and repair for one year and lifelong
service.
Boiler application areas