10t Environment Protection Fully Automatic Oil Fired Gas Fired Hot Water Boiler
The difference between steam boiler and hot water boiler is: different output content, different use, different classification.
First, the output content is different
1, steam boiler: steam boiler outward output with a certain amount of heat steam, high temperature water or organic heat carrier.
2, hot water boiler: hot water boiler outward output rated temperature of hot water.
Second, different uses
1, steaming steaming steam furnace: steam boilers are used in thermal power stations, ships, locomotives and industrial and mining enterprises.
2, hot water boiler: hot water boiler spending more for life, hotels, hotels, baths and so on.
Third, different classification
1, steam boiler: steam boiler is divided into electric steam boiler, fuel steam boiler, gas steam boiler and so on.
2, hot water pot is a furnace: hot water boilerist is divided into electric hot water boiler, fuel hot water boiler, gas hot water boiler and coal-fired hot water boiler.
Part of product paremeters
CWNS0.7-95/70
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 0.7 | |
2 | Water volume | M³ | 1.4 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 99 | |
5 | Output/inlet diameter | mm | DN100 | |
6 | Design fuels | / | Oil/Gas | |
7 | Blow down valve diameter | mm | DN100 | |
8 | Heating area(room) | ㎡ | 6000 | |
9 | Hot water output | M³/h | 18 | |
10 | Bulk size | mm | 2400×1200×1800 |
CWNS1.4-95/70
NO; | Name | Unit | Number | Description |
1 | Rated efficiency | MW | 1.4 | |
2 | Water volume | M³ | 3.75 | |
3 | Rated outlet/inlet water temperature | ℃ | 95/70 | |
4 | Heating efficiency | % | 99 | |
5 | Output/inlet diameter | mm | DN125 | |
6 | Design fuels | / | Oil/Gas | |
7 | Blow down valve diameter | mm | DN125 | |
8 | Heating area(room) | ㎡ | 12500 | |
9 | Hot water output | M³/h | 36 | |
10 | Bulk size | mm | 2800×1700×2300 |
Pre-sale service:
We help customer choose the best boiler model according to
different requirements of various industry. Before delivery we
will provide foundation drawing, layout drawing, boiler room
layout, etc.
In-sale service:
We keep 24 hours online and keep close contacts during the
production process to ensure on time delivery with perfect
finished product.
After-sale service:
1. provide full range of original spare parts.
2. Engineers abroad installation and commissioning service is
available.
3. Our engineers will held a training for boiler workers to
ensure the safe operation.
4. Free maintenance and repair for one year and lifelong
service.
Boiler application areas