Modular clean operating room is to transform complex operating room and medical clean space engineering into customizable industrial products.
Compared with first generation technology(Heavy Structure technology)and second generation technology (Light Structure technology). Modular Quick-install operating room has these features:
(1)Effectively shorten the period of construction: to finish construction of the same size operating room with 4 workers, by Heavy Structure technology, it will take 10 to 14 days,by Light Structure technology,4 to 8 days, while by Modular Quick -install technology, it will just take a single day.
(2)Simplify construction technology: quick-install technology adopt pre manuafacture method . and eliminates cross construction of multi-work. Parts can be made at the same time during pre"manuafacture period.
(3)Effectively cut cost of project: byshortening the period ofconstruction, project expense will be effective cut down.
Cleanliness | Available from class 100 to class 10000 |
Design Scope (from structure, HVAC, electric to auto-control) | 1. Structure: Wall Panel, Ceiling filtering system, Windows, Doors, Various Fittings, Flooring |
2. HVAC: AHU, Ducting, Piping, Chiller, dehumidifier, etc. | |
3. Electric: Lighting, Switch, Cables, Wires, Power Distribution Cabinet, etc | |
4. Auto-control: PLC Controller, Sensors for Humidity and Temperature, Control Panel | |
5. Medical Gas System: Medical gas terminal, medical gas pipeline | |
Temperature | 21-27℃ (or as per required) |
Humidity | 30-60℃ (or as per required) |
Application | Operation Theatre, Medical Center, ICU, etc. |
| New Environmental Laminated board | Traditional Spraying board | |
Feature | 1. can't be scratched by cart or sharp items 2. dust-proof and Antibacterial3. quick assemble and can be move to different place to reassemble 4. easy to disassembly 5. easy to clean 6. no fingerprint | 1.easy to scratch 2.easy to discolor(yellowing after 1.5 years) 3.disposable 4. difficult to clean and maintain | |
Production time | 7 days | 10 days | |
Installation time | 3-5 days | 15-20 days | |
Work life | 10 years | 2 years | |
Others | we got patent in 2018 | normal material |