1) It is crucial to maintain a contaminant-free clean environment when manufacturing medical devices such as biological
implants. This starts with the clean room design and management systems. The clean room design prevents outside contamination, while regular maintenance and sanitation upkeep minimize the risk of contamination originating within the clean room itself.
Wall/ceiling panel | Machine-made or Hand-made sandwich board | |||
Clean room equipment | Air shower, FFU, Pass box, Laminar flow cabinet, hepa box | |||
Cleanliness | Class100-100000 | |||
Purification system | HVAC, or AC conditioner+FFU | |||
Floor | PVC anti-static floor or epoxy-based coating | |||
Other accessories | Stalinist window, LED panel light, Door, Hand wash sink, storage/shoe cabinet etc | |||
Service | Design, manufacturing, construction |
Sandwich panel | Double steel +Sulfur oxygen magnesium filler | Double steel+ rock wool filler | Double steel+ PU filler | Double steel+Mgo filler | Double steel+EPS filler |
Fire proofing | A | A | A | A | B |
Weight Capacity | 180kg/m2 | 80kg/m2 | 100kg/m2 | 100-150kg/m2 | 80kg/m2 |
Size | 1150/1180mm width, height customized | 1150/1180mm width, height customized | 1150mm, height customized | 1150/1180mm width, height customized | 1150mm, height customized |
Steel thickness | 0.376mm, 0.426mm, 0.476mm, 0.526mm, 0.576mm | ||||
Thickness | 50mm, 75mm, 100mm | ||||
Installation | 1. we send engineer to customer side 2. constract out to construction team 3. customer send technicist to our company for free studying |