10.0 Meter Height Contemporary Stainless Steel Sculpture,Large Outdoor Sculpture
This Large outdoor decoration sculpture finished lasted for 3 month,from design,produce,shipping and final Installation in XIAMEN Baichen Seabeach.These two stainless steel were made for 2022 Chinese Golden Rooster Film Festival which located in XIAMEN which is very famous and beautiful tourist city. It was installed in the BAICHEN seabeach near the famous XIAMEN UNIVERSITY.Now become a landmark for the tourist to take photo.
The sculpture give you very strong impression when you saw it first time.The modern outdoor abstract sculpture was made of stainless steel material in polish Mirror which can be lasted very long time.This metal sculpture also with LED light ,It would be very beautiful at the night,it very suit for the Plaza,garden and park. holiday resort as ornament.
Are you interesting in this modern garden sculpture? Come and contact us without any delay! we will give you a wonderful sculpture!!!!
Product Name | 10.0 Meter Height Contemporary Stainless Steel Sculpture,Large Outdoor Sculpture | |||||
Description | Stainless Steel Golden Rooster | |||||
Product size | 10.0 meter height | |||||
Finishing | Mirror Polish | |||||
Material | 316L stainless steel | |||||
Location | XIAMEN | |||||
Packaging | wooden box or Metal frame | |||||
Delivery time | 80 days after deposit received | |||||
MOQ | 1 pc | |||||
Port of loading | XIAMEN CHINA | |||||
Payment term | T/T,L/C,westunion | |||||
ODM & OEM | avalible | |||||
Service | Manufacture,Transportation assistance, Installation instruction, maintenance training, design, etc. |
Features:
1. Shape and dimension can be customized as customer's request.
2. Finish with painting color or baking varnish are available.
3. Animal, figure statue, cartoon, Abstract, Buddha and different shaped are available.
4. Shipping can be arranged by us if necessary.
5. Final installation can be made if you need.
Usual Details :
Production time : 30-50 working days upon MOQ
Packing: Plywood to protect it safety and stable
Payment term :T/T,deposit 50% before production, the balance paid before shipping.