IP55 Outdoor Telecom Galvanized Cabinet With 200A Rectifier System
1. IP 55 Outdoor Telecom Galvanized Enclosure Specifications:
External Size | W*D*H 800*800*2100mm |
Environment Monitoring Unit | 19inch EMU |
Cabinet Layout | 1 compartment |
Cabinet Inlets | From cabinet bottom |
Illumination | DC48V LED lamp with swtich |
Grounding Protection | Copper bar |
Color | Grey RAL7035 (support custom made) |
Power supply source | Lithium battery |
Cooling System | 48VDC Air Conditioner |
Coating | Anti-corrosion outdoor powder coating |
Alarm sensors | Door sensor, water sensor, smoke sensor,temperature and humidity sensor |
Cabinet Lock | Anti-theft three point lock(support padlock) |
Rectufier system | 19inch installation, 200A capacity |
Cabinet video surveillance | Support |
Protection Level | IP55 |
Cooling | Air conditioner |
Laptop stand | Yes, support |
2. 200A Rectifier System Enclosure Details:
2.1 Waterproof, moistureproof, dustproof, and corrosion resistance.
2.2 Floor mounting,Wall mounting,Pole mounting optional.
2.3 Good quality double galvanzied steel,or sandwich panel.
2.4 19” standard installation rack.
2.5 The cabinets system can support Electrical equipments,PDU,Mornitoring system and sensor.
2.6 Switching mode power supplies are available upon request.
2.7 Cabinets cooling uses air conditioner.
2.8 Including -48VDC illumination lamp.
2.9 There are entrance holes individually for power cable, signal cable and optical cable.
2.10 All the cables, sealing and heat insulation used in the cabinet are made from flame retardant materials.
2.11 Coating: Polyester powder coating
2.12 IP55 protection level.
3. Outdoor Enclosure Theft Proof Design:
3.1 Three point lock lock theft proof design
Damage resistance of the theft proof lock meets GA/T 73-1994 “Mechanical Anti-theft Lock” class B requirement, supporting padlock.
3.2 Connection and Fastening
Use anti-loose threaded connection as structure and bearer connection. Door hinges use inner hinge mode.
4. IP55 Galvanized Cabinet Photos:
5. Quality Control Introduction:
Our company resolutely implements the principle of quality first, we control and supervise the whole production process in strict accordance with the requirements of the ISO9001 system and the related implementation process. The quality department strictly controls all aspects like material inspection, production processes, product testing, shipment inspection and establishes traceable documents and product identification. Our quality inspection team, is very familiar with the various standards, strict implementation of the standards required sampling and testing methods.
6. ESTEL Leading Time:
Usually about 10-15 days. The exact lead time need to be confirmed according to the quantity of order.