50 T Double Girder Overhead Travelling Cranes for Industrial workshop
Overhead cranes sometimes also called bridge cranes and eot crane, which are cranes with a hoist or winch traveling along the bridge beween parallel runways. They are designed to meet the medium to heavy industrial lifting requirements, covering all parts of the manufacturing process. Compared with single girder overhead crane, the double grider overhead crane can support biger lift capacity, and more suitable for heavy work duty.
Lifting Capacity | T | 5 | 10 | 16/3.2 | 20/5 | 32/5 | 50/10 | ||
Span | m | 10.5-31.5 | |||||||
Speed | Main Hook Lifting | A5 | m/min | 11.3 | 8.5 | 7.9 | 7.2 | 7.5 | 5.9 |
A6 | 15.6 | 13.3 | 13 | 12.3 | 9.5 | 7.8 | |||
Aux. Hook Lifting | 16.7 | 19.5 | 19.5 | 10.4 | |||||
Traveling of Crab | 37.2 | 43.8 | 44.6 | 44.6 | 42.4 | 38.5 | |||
Traveling of Trolley | A5 | 89.8/91.8 | 90.7/91.9/84.7 | 84.7/87.6 | 84.7/87.6 | 87/74.2 | 74.6 | ||
A6 | 92.7/93.7 | 115.6/116/112.5 | 112.5/101.4 | 112.5/101.4 | 101.4/101.8 | 75/76.6 | |||
Operational Model | Cabin; remote control; ground handle | ||||||||
Working Duty | A5,A6 | ||||||||
Power Supply | Three-phase A.C. 380V, 50Hz |
Safety:
No. | Safety Measures | Foundation |
1. | Loss of phase /voltageprotection | When the voltage/phase is too low, the electricity will disconnect |
2. | Over Voltage, over current protection | When the voltage/phase is too big, the electricity will disconnect |
3. | Overload Limit Switch | When the lift capacity is more than the max rated lift capacity, the electricity will disconnect, crane will stop work |
4. | Weight limit | Supervise the decrease of hook. There is a limit height. The hook cannot fall any more if reach this limit |
5. | Fire limit | Supervise the up and down limit position of Hook. Avoid the over increase and over decrease, protect hoist |
6. | Crane Travel Limit Switch | Supervise the travel of crane, and stop crane travel more than rated travel distance. Keep Safe |
Processing Facility
Main product showcase