Double Beam Double Beam Bridge Crane Two Hooks 380V 50Hz Three Phase
Brief Introduction
Type: QD type double beam overhead crane
Lifting capacity: up to 350/75 ton
Span: 10.5~31.5m. Non-standard design can also be manufactured according to your require.
Structure:
1. The bridge: traverses on the runway;
2. The trolley: traverses on the bridge and lift up and down;
3. The runway: tied to the building structure.
Technical Parameter:
Lifting Capacity | T | 5 | 10 | 16/3.2 | 20/5 | 32/5 | 50/10 | ||
Span | m | 10.5-31.5 | |||||||
Speed | Main Hook Lifting | A5 | m/min | 11.3 | 8.5 | 7.9 | 7.2 | 7.5 | 5.9 |
A6 | 15.6 | 13.3 | 13 | 12.3 | 9.5 | 7.8 | |||
Aux. Hook Lifting | 16.7 | 19.5 | 19.5 | 10.4 | |||||
Traveling of Trolley |
37.2 |
43.8 | 44.6 | 44.6 | 42.4 | 38.5 | |||
Traveling of Crab | A5 | 89.8/91.8 |
90.7/91.9 /84.7 |
84.7/87.6 | 84.7/87.6 | 87/74.2 | 74.6 | ||
A6 | 92.7/93.7 |
115.6/116 /112.5 |
112.5/101.4 | 112.5/101.4 | 101.4/101.8 | 75/76.6 | |||
Operational Model | Cabin; remote control; ground handle | ||||||||
Working Duty | A5,A6 | ||||||||
Power Supply | Three-phase A.C. 380V, 50Hz or customized |
Overhead Crane Option:
Control way | Pendent line control, Cabin control and remote control |
Electrical parts | SCHNEIDER, SIEMENS, CHINT |
VFD | SCHNEIDER, SIEMENS, CHINT, YASKAWA |
Motor | XINDALI, JMU, ABM. ABB, WEG. SIEMENS or any special specified |
Reducer | TAILONG, TAIXING, SEW or any special specified |
Working duty | A5/A6/A7/A8 |
Overload limiter | YES/NO |
Audible and visual alarm |
YES/NO |
ISO Certificated QD overhead travelling crane price
a. the trolley with hoist and traveling mechanism moves on the crane span structure, its metal structure is box-type double beam
b. According to the lifting device, the double girder crane may include hanger, grab bucket, electromagnetism and multipurpose bridge crane
c. It is widely used in material handling station with frequent work such as mines, factories, dock and warehouse
d. it is divided into 2 working grades of A5 and A6 according to operating frequency.
Packing & Delivery terms:
1. Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during the delivery.
2. Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the transportation.
3. Only the best transport solution will be taken for saving your cost uttermost on finance, security and time.