High Reliability Electric Customized Motor Pulling Factory Warehouse Electric Wire Rope Hoist
Product Description
Electric Hoist Based on bringing in and assimilating foreign advanced technology, this type of crane takes modular design theories as guidance, uses modern computer technology as means, introduces optimized and reliable design methods, which is new type of crane made by employing import configuration, new material and technology has features in light-weight, generalizing, energy-conservation and environmental protection, maintenance free and high technology content.
The electric hoist is a lifting transport device for vertical lifting and horizontal movement. Mainly used for single girder overhead cranes, single girder gantry cranes. The safe work load is marked on the inspection schedule and equipment label. At the same time, during the operation, the safe working time and startup time of the device can be recorded.
Features:
1. Miniature electric hoist design clever, easy to use.
2. when the weight limit is met up to stop automatically when ascension.
3. if rope hoist motor, reverse ascension will stop working automatically.
4. 220V power source operation.
5. for plug-in cord, easy to use.
6. hoist crane can rotate 360°.prevent wire rope.
Adopt urgent stop switch and reinforced breaking switch position limit. protection class up to Ip54. With thermal prevention device.
Note:
· Please do not overload the use of.
· It is recommended to use a double rope pulley.
· When using, please wear thick leather gloves, do not let the hand contact.
· Do not use the brake as a limit switch.
· Do not use micro electric hoist as a manned elevator.
· When using a miniature electric hoist, make sure the rope holds at least three turns of wire rope.
· To participate in the construction of welders, electricians, rigger must be certified.
· To enter the construction site must wear a safety helmet.
· Before the operation, the workers are not allowed to drink.
· The site is not allowed in the barefoot, wearing slippers, high-heeled shoes and trousers.
· Non construction personnel are not allowed to enter the construction area.
· Construction site welding, must do a good job of fire prevention measures and configure the appropriate type, quantity of fire extinguisher.
· Oxygen bottle acetylene bottles should be placed separately 5-7m, the use should be strictly according to the operating procedures.
To ensure the safety, we equip the following safety devices:
1. Weight overload protection device
2. Lifting height limit device
3. Voltage lower protection function
4. Phase sequence protection function
5. Emergency stop function
6. Rain cover for outside hoist, driving units, electrical cubicle
7. Warming indicator, flashing lights and warming sound
8. Wireless infra-detector for anti-collusion
Our service
1. 12 months warranty after installation and commissioning in addition to the human damage factors.
2. 1 year spare-parts provided for better maintenance.
3. Professional technical staffs provide installation, commissioning and training services. The installation team can be sent to local site to install for customer.
4. Delivery with English user manual, parts manual, product certification and other relevant certificates.
5. Technical advisory for any time.
6. Test before shipment.
Packing
1. Delivery time
Within 20 to 30 days after receiving the receipt of deposit.
2. Packaging
Wood case for hoist and electric parts.
3. Transportation
Generally 35 days to 50 days to destination port.