YZ Double Girder Casting Bridge Crane
Brief Description:
YZ Double Girder Casting Bridge Crane is consisting of the beams, lifting and cross travelling mechanism, long travelling mechanism, cabin, and electrical control system. The trolley can move horizontally on the rail fitted on beams. The beams are welded by the machine hands, which make the structure more reasonable and reliable. Overhead beams can be four when lifting weight is over 125t. Main hook is used for handling casting ladle, and aux. hook is used for cooperating with the main hook to complete the pouring out steel water, slag or other instrumental work.
YZ Double Girder Casting Bridge Crane with hook is mainly used for lifting the metal iron or steel in the foundry workshop. The working class of the complete machine is A7-A8, and thermal-protective coating is added at the bottom of the main girder. The lifting weight is from 75t-320t. The crane are equipped with gantry hook, The gantry hook is make from high quality low-alloy structural steel plate stacked-type splicing and use rivets fastening, very safety and reliable for using.
Main Features:
1. Reasonable structure,strong bearing capacity
2. Low noise, soft starting and stopping
3. Safe and reliable operation
4. The power of crane is three-phase AC; rated frequency is 50HZ, rated voltage is 380V.
5. The temperature of working environment is -10~+60 centigrade.
6. The relative humidity is no more than 50% when the temperature is +40 centigrade.
7. If the requirements are more than the above mentioned , we could special design for you.
8. Safety devices: Weight overload protection device; Top quality long time bearing polyurethane materials buffer; Lifting limit switch and traveling limit switch; Emergency stop system; Zero voltage protection; Phases protection device.
9. Customized: design and manufacture according to your request.
10. Package: By national station exporting standard plywood box, wooden pallet or in 20ft & 40ft container. Or as your demands.
Environmental conditions:
1.The power of crane is three—phase AC;rated frequency is 50HZ;rated voltage is 380V;
2.The temperature of working environment is-10~+60℃;
3.The relative humidity is no more than 50% when the temperature is+40℃;
4.If the requirements are more than above-mentioned,it shall carry out the requirements in the purchase contract as the user asks.
Lifting Capacity (t) | 100/32 | 125/32 | ||||
Span (m) | 19 | 22 | 25 | 19 | 22 | |
Speed (m/min) | Main Hook Lifting | 6.8 | 6.8 | 8.6 | 9.5 | 7.6 |
Aux. Hook Lifting | 9.5 | 9.5 | 12 | 12 | 9.5 | |
Traveling of Trolley | 37 | 37 | 41 | 42 | 36 | |
Traveling of Crane | 68 | 68 | 77 | 77 | 77 | |
Max wheel pressure(Kn) | 520 | 530 | 545 | 580 | 595 | |
Steel track recommended | QU120 | |||||
Operational Model | cabin; remote control | |||||
Working Duty | A7/A8 | |||||
Power Supply | 380V, 50Hz or as your requirement | |||||
Structure | bridge, crab, connecting traverse, trolley mechanism and electric part |