90TPD copy paper making machine white printing paper making machine
Four roll two press nips
Press section of this copy paper making machine adopts one suction pickup, one four roll two press nips and one main press. The four roll two press nips are composed of one set vacuum roll, one set rubber upper roll, one set rubber bottom roll and one set stone roll. All rolls adopts
Main parameters:
Item | Size | Remarks |
Vacuum roll | Φ700x3300mm | Roll cylinder is stainless steel. |
Upper rubber oll | Φ650x3300mm | Rubber thickness is 20mm and hardness is shore “A“95°±2” |
Bottom rubber roll | Φ700x3300mm | Rubber thickness is 20mm and hardness is shore “A“95°±2” |
Stone roll | Φ650x3300mm | Roll cylinder is made in natural granite. |
FAQ:
1. How to install and maintain the machine?
A: Firstly,we will provide the installation guild with the machine for your reference.
Secondly,our company is responsible for training production workers for you, ensuring that the workers will be independent operation.
2. How can we get the matching accessories or wearing parts conveniently?
A: During the warranty,Our company can replace the accessories for free .Out of warranty,we can provide them at the preferable price .In fact,the wearing parts are standard parts that you could get it in your country at your convenience.
3. Why would I choose your company?
A: Firstly,Our company has rich paper machine design and experience, and is the collection of paper making machinery research, design, manufacture, installation,commissioning and service, becoming one of the multi-functional enterprise.
Secondly,our company could provide the marvelous after-sale services,which is responsible for all installation and debugging, and training the production workers ,ensuring that the workers will be independent operation.
Thirdly,our company persist in the slogan “Customer’s satisfaction is our standing pursuit”.
Warm Tips:
1. Before installation,you should check that equipment’s model and dimension are all right with the parts completed and level remaining.
2. Before the debugging of installation,Checking each part is correct, lubrication supply normal. Water, electricity values reaching the standard.
3. During Operation,you should pay attention to keep daily inspection, cleaning and oiling.and then examine and repair regularly.