Decorative Modern Movable Office Partition Walls Hang Track On The Ceiling
Details of Movable Partition Walls System
1. Eight characters and functions:
(1) hang track on the ceiling, not the floor;
(2) heat insulation and fireproof
(3) stable and safe
(4) energy-efficientcy
(5) elegant appearance
(6) collection convenient
(7) widely used in different places
2. Usage:
Type 65 is suitable to use at 2m-3.5m height space.
Type 80 is suitable to use at 2m-6m height space.
Type 100 is suitable to use at 3m-9m height space.
3. Each panel load-bearing weight: 225kgs/ 450kgs/ 650kgs
4. Sound insulation coefficient:
Type 65 highest sound insulation coefficient can be reach is 36db.
Type 80 the highest sound insulation coefficient can be reach is 50db.
Type 100 the highest sound insulation coefficient can be reach is 53db.
5. Application: Gymnasium, huge meeting rooms, auditorium, conference center, multifunction room, hotels, banquet hall, exhibitions halls, office etc.
Specifications of Movable Partition Walls System
Panel Suspension | Top hunge system without the need for a floor track. | ||
Panel Width | Each panel 600mm-1200mm. | ||
Track | Aluminum OR Steel Track | ||
Roller on panel | Single or Double Roller | ||
Panel Frames | Heavy-duty steel-gusseted aluminum inner frames reinforced with full height. | ||
Top&bottm seals | Top and bottom pressure retractable seals ensure effortless moved and locked. | ||
Module | 700mm - 1200mm maximum. | ||
Panel stacking | Numerous panel stacking options for complete flexibility. | ||
Panel face | MDF,Plywood, woven fabric, Leather,Natural wood veneer, Melamine,Wood moldings, etc. | ||
Finishes | Satin anodised or polyester powder coating to all exposed aluminium components available in a wide range of colours as standard. |
How to install the movable partition walls
1. After the movable partition walls rail is transported to the construction site, the construction personnel should first understand the general decoration style of the site, including the ceiling shape, the ground shape, whether there is a skirt line on the movable partition wall, etc., timely communicate with the on-site woodworker, and then release the line to determine the track installation. position;
2. After the horizontal line is placed, the construction side will determine the layout direction of the air-conditioning duct fire-fighting pipe, and it is convenient to determine the steel structure installation form, whether it is a straight pull or a diagonal support or a U-slot fix. These are responsible installation teams. Do the preparation before the construction, otherwise work and do things, when the impact on the site construction layout, but also to rework, seriously affect the construction progress, will also bring unnecessary trouble to Party A;
3. After the movable partition walls track is installed, the track level will be self-checked again, and finally the steel structure will be rust-proofed, and then Party A will be notified and the position of the track movable port will be clearly stated. When the ceiling is clearly indicated, it cannot be fixed with the track. Otherwise, loading and unloading The door panel will likely damage the integrity of the ceiling.