Folding Operable Partitions , Office Aluminum Sliding Doors , Room Dividers For Hotel
Specifications
Technical Parameter for Partition Panel | Panel Width | 500 - 1230mm |
Panel height | 2000 - 6000mm | |
Sound proof | 36 - 42 db | |
Operation | Manual | |
Frame | Aluminum | |
Vertical profile | Anodised aluminum profiles with integrated magnetic strip and sealing edges on the inside | |
Finish options | Fabric, veneer, HPL melamine, vinyl, carpet, customers own material, Bare finish | |
Base options | Plywood, Gypsum, steel, MDF | |
Max width | Unlimited | |
Panel weight | 25 – 42 kg / sq | |
Pass door selection | door | Single or double door |
Seals | Top | Manual |
bottom | Manual |
Panel Surface Finish :
The panel surface will be as per the clients requirement finished either in BUNGE factory – China or by others . The basic panels will be raw MDF (the finish materials such as laminate, veneer, melamine or fabric etc .)
Operation :
Partitions shall be top supported, manually operated panels stacked in an area nominated in the plans. When closed, the operable wall shall provide a complete sound retardant barrier. No floor track shall be used.
Track :
The tracks are made from extruded 6063 – T6 anodized aluminum . The track housing shall utilize grooves and interlocking steel pins for positive alignment of adjacent track sections , and shall be reinforced overhead by drop rod brackets . Aluminum track housing shall include an integral nut slot to accept a hardened square nut for attaching each drop rod bracket to the top of the track .
Trolley :
BUNGE Centre / Side / Remote stacking system with a Two wheeled nylon trolley made with the base Material of POM 45 tempered steel shall be used as per approved stacking method .
Applications :
Our products (Movable Partitions) are widely used in the hotel banquet halls , meeting rooms , exhibition halls , conference rooms , International Convention Centers , KTVs , upscale restaurants , office buildings , schools , hospitals and others .
Stacking :
The panels will be stacked as per the agreed method and in accordance with the architetural plan. Centre stacking arrangement will be utilized for the subject project.