Dismountable Banquet Hall Movable Non-woven Landscape Painting Partitions Wall
Series | BG 65 | BG 85 | BG100 |
Panel supension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65 mm | 85 mm | 100 mm |
Max height | 400 mm | 600 mm | 800 mm |
Panel width | 600-1230 mm | 600-1230 mm | 600-1230 mm |
Face material | 9 mm | 9 mm | 9 mm |
Pass doors | Single Door or Double Door | ||
Sound insulation | 20 – 32 db | 28 – 36 db | 32 – 50 db |
Finish Material | Plywood / MDF /Laminate / Melamine / Gypsum | ||
Board / Fabric / Insulation / Fireproof /Wall Paper /Vinyl /Painting /etc,(Customized) |
Advantages of moving walls
1: No floor track
Need not laid ground course, do not destroy whole to decorate the effect
2: Stable and firm
Each partition can be fixed independently, stable and reliable, not easy to swing
3: Sound insulation and environmental protection
Sound insulation effect is good, sound insulation coefficient can reach 50 db above
4: Heat insulation and energy saving
Excellent heat insulation performance, different seating rate pattern, the large space divided into small space
5: Efficient fire prevention
Adopt efficient fireproof material, good fireproof performance
6: Convenient collection
Close board when, partition wall can be concealed in special store ark, do not affect integral and beautiful
The production process of partition wallboard
1: Aluminum, double round pipe, double transmission rod and other hardware parts assembled together, forming a basic frame of the door, the frame is the foundation, the most important process of the entire partition wall board
2: Soundproof cotton is filled in the door panel, so that the partition wallboard has a more three-dimensional feeling, the sound of knocking the door panel is smaller, while playing an effective sound insulation effect
3: Each wallboard shall be packaged on the second floor, with bubble film inside, effectively protecting the partition wallboard and outsourcing paper to prevent it from being scraped. From the production to the packaging of more than 100 to the working procedure, each layer shall be checked to make every detail perfect
Installation site of partition wall
1: Installation track
Track is the base, is the priority among priorities of all links, through percussion drilling expansion screws, welding Angle iron and other steel materials fixed up.
2: Insert the door panel
The moving door panels are suspended in the rails without any support on the ground.
3: Installation and debugging
Free and flexible, move the door panels according to whatever you need to change the layout
4: Close against the wall
Convenient collection, save space
Cooperation steps
Step 1: send us an inquiry.
Step 2: send us detailed engineering drawings or dimensions.
Step 3: we offer solutions and quotes.
Step 4: negotiate and discuss details.
Step 5: place the order and arrange the deposit.
Step 6: make detailed construction drawings and review before production.
Step 7: determine the construction drawing and arrange production.
Step 8: quality control and inspection.(production pictures are provided for verification)
Step 9: arrange shipment after receiving the balance.
Step 10: provide installation drawings
Step 11: after sales service