Precision Bending Accessories, Sheet Metal Parts, Brushing Panel
Quick details:
1. Keyword: Sheet Metal Parts
2. Process: Sheet Metal Fabrication
3. Color: Any
4. Place of Origin: Guangdong, China
5. Application: Any
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Lead time: 1-2 weeks
Description:
Our company has more than ten years of experience in sheet metal production, and we can quickly understand and strictly implement all kinds of customer needs. Because our company has always been known for its high quality and high-quality service, and the cooperation with each customer is very harmonious. Our technical team is very professional. Every link cooperates very smoothly and efficiently, which can save you a lot of time.
”Support our customers by providing innovative, cost-effective, engineered solutions, prototypes, components, and assemblies, enabling our respective business partners to achieve superior financial results and quality growth.”
Establish a challenging and enjoyable work environment to promote teamwork.
Maintain our integrity with customers, suppliers, and employees.
Support our business partners, and exceed their expectations.
Be unified in our support and our pursuit of a unified vision.
Develop our people to be the best in the industry.
And we also have the most professional engineer and best sales.
Specification:
Material | Stainless Steel |
Application | Any |
Color | Any |
Package | Carton Box |
Surface treatment | Testure/Sand/MT/YS/SPI/VDI |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ
Q1: Are you a trading company or manufacturer?
A1: We are a factory.
Q2: How to get a quotation?
A2: Please send us drawings in IGS, DWG, STEP, etc. together with a detailed PDF. If you have any requirements, please note them, and we could provide professional advice for your reference.
Q3: What if we do not have a drawing?
A3: Samples and drawings are available; Of course, we would ensure the safety of the drawing.
Q4: How long is your delivery time?
A4: It would be 3-4 weeks normally for the parts to be ready and we had a system to ensure the time.
Q5: Do you provide samples? Is it free or extra?
A5: Yes, we could offer the samples at an extra charge.

