Precision CNC Stainless Steel Sphere, Machined Mirror Polishing Parts
Quick details:
1. Keyword: CNC Stainless Steel Parts
2. Process: CNC Machining
3. Color: As per your requirement
4. Place of Origin: Guangdong, China
5. Application: Widely used
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Equipment: CNC Machining Centers
8. Lead time: 1-2 weeks
Description:
Shenzhen Perfect Precision Product Co., Ltd was established in 2012 and now has a large facility with covering an area of 3000-5000 square meters in Shenzhen. A preferred business partner providing OEM and ONE-STOP service of metal stamping parts and CNC Machining parts for 10 Years.
7 Swords is able to meet customers’ requirements for all kinds of metal parts made out of stainless steel, carbon steel, aluminum, brass, copper, bronze and etc., which are based on customers’ drawings or original samples.
As a professional supplier, 7 Swords strives to keep the principles of Integrity, Quality, and Competitive Prices all the time.
The professional technical team and sales team are ready for your projects at any time. Their highly efficient response and full service make perfect drawing design, quotation, sample checking, production, delivery, shipping, and after-sales service for customers.
Specification:
Material | Stainless Steel |
Application | Widely used |
Color | Silvery |
Package | Carton Box |
Surface treatment | Bushing/ Laser engraving/ Etching/ Polishing/ Silkscreen/ Sandblasting etc. |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ
1. Where is your factory?
We are located in Shenzhen, China.
2. What do you need to provide a quote?
Please kindly send us the drawings or samples of your product. Details below should be included: Drawings/Quantity/Material/Other Requirements
3. How about the packing?
Standard or customized will both be available.
4. Will my drawings be divulged if you benefit?
No, we pay much attention to protecting our customers’ privacy of drawings, and signing NDA are also accepted if needed.
5. What about the leading time for mass production?
Frankly, it depends on the order quantity, and it is common about 7 days to 15 days after your deposit if no tooling is needed.