6BB1 6BD1 Diesel Engine Cylinder Liner 9-11261-118-0 1-11261118-0 For ISUZU
Specification
Applicable models | 6BB1 6BD1 |
Type | Cylinder liner |
Original number | 9-11261-118-0 1-11261118-0 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
Reason for cylinder pulling: poor cooling | Poor cooling will result in excessively high temperature of the cylinder and piston, and poor lubrication; Poor cooling can cause excessive expansion and deformation of the piston and cylinder liner due to overheating, loss of the original normal clearance, and cylinder pulling. The reasons for poor cooling include insufficient discharge pressure of the cooling water pump, insufficient or interrupted water supply; Rust or dirt in the cooling water chamber; Water contains bubbles that accumulate in the cooling chamber but are not released, resulting in air resistance; The water quality is too dirty and the water temperature is too high. |
Diesel engine cylinder pulling refers to the phenomenon of excessive wear, burrs, scratches, scratches, cracks, or bites on the working surface caused by the intense interaction between the piston components and the working surface of the cylinder (caused by friction) |
Product Description
,
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping