TD42 Engine Oil pump 15010-06J02 15010-VB200 15010-VB201 Suitable For NISSAN Diesel engines parts
Specification
Applicable models | TD42 |
Type | Oil pump |
Original number | 15010-06J02 15010-VB200 15010-VB201 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
mechanical principle | Oil volume regulation |
Mechanical installation | 1. The quality of the pump installation has a very important impact on the smooth operation and service life of the pump, so the installation and calibration work must be carried out carefully, and it is not allowed to act rashly. 2. The installation height, length and pipe diameter of the pump suction pipe shall meet the calculated values, and strive to be brief to reduce unnecessary losses (such as elbows); And ensure that the allowable NPSH is not exceeded when the pump is working. 3. Suction and discharge lines should have brackets. The pump is not allowed to bear the load of the pipeline. 4. The place where the pump is installed should be spacious enough to facilitate maintenance. |
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping