D7E S200G mini turbocharger 12709880018 CH1946
Specification
Applicable models | D7E S200G |
Type | Engine turbocharger |
Original number | 12709880018 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
matters needing attention | Don't leave without a car After the engine is started, especially in winter, it should be idled for a period of time so that the lubricating oil can fully lubricate the bearing before the supercharger rotor runs at high speed. Therefore, do not slam the accelerator immediately after startup to avoid damaging the oil seal of the supercharger. |
Maintenance error | Myth 2: turn off the engine when you arrive at your destination After the engine runs at high load for a long time, the owner must run at idle speed for several minutes before turning off the engine, so that the parts can be effectively cooled and lubricated. The behavior of turning off the engine immediately will cause the vehicle to be in a high-speed idling state. The same problem as sudden acceleration will damage the bearing of the vehicle. |
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping