EK100 EK330 Diesel Engine Pump 16100-3122 16100-3123
Specification
Applicable models | EK100 EK330 |
Type | Water Pump |
Original number | 16100-3122 16100-3123 |
Warranty | 6 months |
Engine Type | Diesel |
Brand Name | HDPARTS |
Condition | New |
Size | OEM Size |
Main problems of water pump | Water pump heating Cause: bearing damage; The clearance of rolling bearing or bracket cover is too small; The pump shaft is bent or the two shafts are not concentric; The tape is too tight; Lack of oil or poor oil quality; The balance hole on the impeller is blocked, and the impeller loses balance, increasing the thrust to one side. Troubleshooting: replace the bearing; Remove the rear cover and install a gasket between the bracket and the bearing seat; Investigate the pump shaft or adjust the concentricity of two shafts; Adjust the tape tightness properly; Fill with clean grease, which accounts for about 60% of the clearance in the bearing; Remove the blockage from the balance hole. |
Introduction to water pump | Water pump is a kind of machinery to transport liquid or pressurize liquid. |
Product Description
Company Information
Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.
At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.
is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.
covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.
Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.
The product matching different kinds of excavator spare parts, which caters to the current market demand for high.
Packaging & Shipping
Packaging material:Plastic, carton, wooden box
We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)
Packaging & Shipping