Precision Bending Sheet Metal Parts, Silver Color, Extrusion Parts
Quick details:
1. Keyword: Sheet Metal Parts
2. Process: Sheet Metal Fabrication
3. Color: Any
4. Place of Origin: Guangdong, China
5. Application: Accessories
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Lead time: 1-2 weeks
Description:
Shenzhen Perfect Precision Product Co., Ltd mainly manufactures CNC machining parts, CNC turning parts, stamping parts, and high-precision mold parts based on customer demand/drawings. OEM&ODM orders are both warmly welcomed.7 Swords is in strict accordance with the ISO9001: 2015 and ISO13485:2016 system for production management. All products need to be tested and checked by the workers themselves, then our QC staff will test the item size, appearance, and tolerance again and again to avoid any burrs or scratches on the products. The qualified items will be moved to the packing department; they will pack the goods based on customers' requirements. Normally, we pack the goods in cartons with solid wood pallets to avoid any erosion and damage in transit.
Specification:
Material | Stainless Steel |
Application | Accessories |
Color | Any |
Package | Carton Box |
Surface treatment | Testure/Sand/MT/YS/SPI/VDI |
Drawing format | 2D/(PDF/CAD),3D(IGES/STEP) |
Certificates | ISO9001:2015/ISO13485:2016 |
Lead time | 1-2 weeks |
FAQ
1. You have no 3D drawing, how should I start the new project?
Samples or an idea or a sketch will be good too, my engineering department can design the 3D drawing on the new project.
2. Where is your factory and how can I visit it?
Our factory is located in Shenzhen city and you can get more detailed information by browsing our website: http://www.7-swords.com or by Visiting us in person.
3. Why choose 7 Swords?
As an excellent supplier profit/ Assurance for you:
1) 100% Product quality protection
2) 100% On-time shipment protection
3) 100% Payment protection
4) 100% inspection before shipment
5) Much received popular "machining parts" factory
Our products profit for you:
1) Mix color designs for your winning market
2) More than 10 years of manufacture of hydraulic spare parts
3) More than 10+ years of export experience
4) All products passed ISO9001 and ISO13485
5) One-stop service experience of more than 10+ years
4. What about the leading time for mass production?
Frankly, it depends on the order quantity, and it is common about 7 days to 15 days after your deposit if no tooling is needed.

