What is the PCB used for?
After the electronic equipment adopts the printed board, due to the consistency of the same type of printed board, the error of manual wiring is avoided, and the automatic insertion or mounting of electronic components, automatic soldering, and automatic detection can be realized, which ensures the quality of the electronic equipment. , improve labor productivity, reduce costs, and facilitate maintenance.
Double-sided is an extension of single-sided. When single-layer wiring cannot meet the needs of electronic products, double-sided is used. Both sides have copper cladding and traces, and the lines between the two layers can be conducted through vias to form the required network connections.
What are the application fields of printed Circuit boards?
Mobile phones, microwaves, Consumer Electronics, communications, network base stations, hybrid integrated circuits, and home fans.
What certificates and capacity does ABIS have?
We have ISO14001, ISO9001, UL, and so on.
Raw material | FR-4, High TG FR-4, PTFE, Aluminum Base, Cu base. Rogers, etc |
Board Thickness | 0.20mm--8.00mm |
Layer | 1 Layer-20 Layer |
Insulation Layer Thickness | 0.075mm--5.00mm |
Min.hole size | 0.1mm (drilling hole) |
Max. Board size | 200mm*600mm |
Out Layer Copper Thickness | 18um--350um |
Inner Layer Copper Thickness | 17um--175um |
NPTH Hole Tolerance | +/- 0.075mm |
PTH hole Tolerance | +/-0.05mm |
Outline tolerance | +/-0.13mm |
Surface finished | HASL, ENIG, Chem. Tin, Flash Gold, OSP, Gold finger |
Solder Mask Type | LPI |
Others | RFQ. |
What is your Lead Time?
Category | Q/T Lead time | Standard Lead Time | Mass Production | |||
| ||||||
2 Layers | 24hrs | 3-4 working days | 8-15 working days | |||
| ||||||
4 Layers | 48hrs | 3-5 working days | 10-15 working days | |||
| ||||||
6 Layers | 72hrs | 3-6 working days | 10-15 working days | |||
| ||||||
8 Layers | 96hrs | 3-7 working days | 14-18 working days | |||
| ||||||
10 Layers | 120hrs | 3-8 working days | 14-18 working days | |||
| ||||||
12 Layers | 120hrs | 3-9 working days | 20-26 working days | |||
| ||||||
14 Layers | 144hrs | 3-10 working days | 20-26 working days | |||
| ||||||
16-20 Layers | Depends on the specific requirements | |||||
| ||||||
20+ Layers | Depends on the specific requirements |