Our company has about 1100 workers and two PCB workshops with about 50000 square meters.
Our products are mostly used in the field of Industrial Control, Telecommunication, Automotive products, Medical, Consumer, Security, and others.
What is the difference between the Surface Finish of PCB?
In PCB interface card applications, soldering won't be the only connection method. Many kinds of PCBs need more than one surface operating. The solder dip PCB process with air knife leveling is called the "Hot Air Solder Leveling" (HASL) process. But the interface cards finger area needs Nickel-Gold plating.
What are the Applications of FR4 PCB?
With the high development of electronic products, the mass production of FR4 PCB has been stimulated. From the radio, TV, and tape recorder, to the walkman, calculators, computers, laptops, SPC exchange, mobile phones, etc, they are all examples.
What certificate does ABIS have?
We have ISO14001, ISO9001, UL, cUL, and TS16949. You can see more in our company profile.
What capacity does ABIS have?
Raw material | FR-4, High TG FR-4, PTFE, Aluminum Base, Cu base. Rogers, etc |
Board Thickness | 0.20mm--8.00mm |
Layer | 1 Layer-20 Layer |
Insulation Layer Thickness | 0.075mm--5.00mm |
Min.hole size | 0.1mm (drilling hole) |
Max. Board size | 200mm*600mm |
Out Layer Copper Thickness | 18um--350um |
Inner Layer Copper Thickness | 17um--175um |
NPTH Hole Tolerance | +/- 0.075mm |
PTH hole Tolerance | +/-0.05mm |
Outline tolerance | +/-0.13mm |
Surface finished | HASL, ENIG, Chem. Tin, Flash Gold, OSP, Gold finger |
Solder Mask Type | LPI |
Others | RFQ. |
What is your Lead Time?
Category | Q/T Lead time | Standard Lead Time | Mass Production | |||
2 Layers | 24hrs | 3-4 working days | 8-15 working days | |||
4 Layers | 48hrs | 3-5 working days | 10-15 working days | |||
6 Layers | 72hrs | 3-6 working days | 10-15 working days | |||
8 Layers | 96hrs | 3-7 working days | 14-18 working days | |||
10 Layers | 120hrs | 3-8 working days | 14-18 working days | |||
12 Layers | 120hrs | 3-9 working days | 20-26 working days | |||
14 Layers | 144hrs | 3-10 working days | 20-26 working days | |||
16-20 Layers | Depends on the specific requirements | |||||
20+ Layers | Depends on the specific requirements |