Total investment of the new project of Oriental Carbon under-construction (2024) is 1.08 billion CNY, new plant covers an area of 120,000 m2 including a 75,000 m2 new industrial plant and a 60000 m2 &10 megawatt rooftopsolar power system. In the future, we will follow the industry concept of technology-driven innovation,and strive to build a modern graphite production base which is digital, intelligent and low carbon.