Technical requirements for delivery inspection
1. Output: Granular material 1-2t/h
2. Mixing uniformity of the mixer: variation coefficient cv<8%
3. The temperature of the pellets after cooling: not higher than room temperature 5 degrees
4. Particle moisture content: <13% (raw material moisture content <13%)
5. Requirements for steam boilers: 0.2T/H 0.2-0.4MPa (provided by the buyer)
6. Power requirements: 380V/50Hz three-phase four-wire 73KW (equipment capacity)
7. Equipment dimensions: length 8m, width 3.5m, height 6m.
8. Installation conditions:
(if the supplier is required to install, the following preparations must be made in advance):
a. The buyer shall prepare the plant pit, install the boiler and power supply before
equipment installation.
b. During installation, the buyer shall provide one on-site mechanic and one electrician
(responsible for future equipment production and maintenance), and 3-4 assistant
workers.
c. Provide a set of electric welding machine, oxygen acetylene electrode and 3T hand chain
hoist (see the list of installation tools for details).
d. The supplier sends a technician to the buyer’s factory to be responsible for installation,
commissioning and training of operators; the buyer’s board and lodging expenses
during installation.
e. Installation and commissioning time:
It will be completed within 15 days if the buyer has the conditions.
.