Technical Service - Professional Staff - Dissolving System - BJVP
Overview:
BJVP professional staff will give on-site guidance of installation and commissioning. On-site technical training. In order to enable the normal installation, commissioning, operation and maintenance of equipment in the contract, the supplier is responsible for providing the appropriate technical training. Training plan: the supplier is responsible for training, so that the operator should be able to master the operation and maintenance methods of the system.
Type of VI:
Base oil:10~500cst; Liquid VI 7075: ~1300cst(100℃),~2800 cst(80℃) ; Liquid VI V261: ~1600cst(100℃),~3100 cst(80℃)
Parameters:
Item | Description | Parameter | Unit | Note | |
1 |
High Shear Cutter |
Motor | 20T | 132KW | Inverter Duty |
10T | 75KW | Inverter Duty | |||
380 | V | ||||
5~50 | HZ | ||||
2 |
High Shear Pump |
Flow rate | 30 | m³/h | |
Pressure | ≤0.25 | MPa.A | |||
Motor | 45 | KW | Inverter Duty | ||
380 | V | ||||
5~50 | HZ | ||||
3 | Transfer Pump | Flow rate | 30 | m³/h | |
Pressure | 1.1 | MPA | |||
Motor | 22 | KW | Inverter Duty | ||
380 | V | ||||
5~50 | HZ |
Product Advantages:
Requirements for Users: