Specifications
Brand Name :
Huashida
Certification :
ISO9001
Place of Origin :
Qingdao,Shandong,China
MOQ :
1
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time :
2months
Packaging Details :
according to the actual condition
specification :
PE-880
Main extruder :
110
Pipe diameter (mm) :
960mm
capacity (kg/h) :
800
Description

Vacuum Casing Case Shell Pipe Insulated Pipe Production Line,Easy to operate

Product Description

Technical Prameters:

PE-365/760 PE-420/960 PE-850/1372 PE-960/1680
Main extruder SJ-90/33 SJ-90/33 SJ-120/33 SJ-150/33
Pipe diameter (mm) Φ365-960 Φ420-960 Φ850-1372 Φ960-1680
capacity (kg/h) 550-700 550-700 700-900 800-1200
Installed power (kw) 360 380 440 580
Length (m) 35 36 40 48

gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery

The working principle and manufacturing process of Huashida's insulation pipe production line: This project adopts vacuum sizing technology. Through continuous mixing equipment, an efficient extruder is used to extrude the tube billet through the die head, and thin-walled pipes are formed through vacuum adsorption and spray cooling. Then the pipes are pulled by multi-track traction technology. Through the circular cutting saw, the pipe and the sawing device can move at the same time, and the circular cutting can be carried out during the moving process to form an automatic tracking of the working process of fixed length cutting. The whole manufacturing equipment adopts PLC programmable computer control technology to control the speed, pressure, temperature and other process parameters of each machine.

960mm Vacuum Casing Case Shell Insulated Steel Pipe Production Line

HDPE Jacket Process Flow:

Vacuum feeding PE granule-->hot air dry material-->extrusion plasticizing-->mold shaping-->Vacuum sizing-->water cooling-->Pulling out-->cutting pipe-->carrier laying-off pipe

Composition of Equipments:

1.hopper dryer ⒉ Single Screw Extruder ⒊ extrusion mould die ⒋ Head bracket ⒌ Vacuum calibration device ⒏ Water cooling tank ⒐ haul-off ⒑ Planetary cutting machine 11.Pipe bracket ⒓. Loader 13. PLC

PU Foaming Pre-insulated Pipe Production process Flow:

The production process of "pipe in pipe" (PU Foaming Pre-insulated Pipe) mainly includes three steps: surface pretreatment of steel pipe, production of HDPE outer protective pipe and production of insulation layer.

960mm Vacuum Casing Case Shell Insulated Steel Pipe Production Line


The production steps of insulation layer are as follows: firstly, the steel pipe is penetrated into the high-density polyethylene outer protection pipe to form a casing structure, and the supports are evenly arranged in the annular space between the steel pipe and the high-density polyethylene outer protection pipe, and the two ends are sealed by flanges; secondly, the casing is hoisted on the foaming platform, and the polyurethane foaming material is injected into the casing by high-pressure foaming machine; finally, the polyurethane material is foamed After curing, the sealing structure at both ends is removed to complete the production process of the insulation layer.

Rigidity due to the presence of strong ties between the steel pipe layer polyurethane insulation and jacket pipe and provides pre-shot blast or blast cleaning the surface of the steel pipe, optimum performance polyurethane insulation, corona surface of polyethylene pipe shell.
960mm Vacuum Casing Case Shell Insulated Steel Pipe Production Line
gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery Advantages:
Significantly increases the reliability of the pipeline in the PUF insulation system operational availability of remote condition monitoring PUF insulation, which allows to detect and repair leaking coolant, preventing accidents typical for thermal networks of other designs.
Highly cost-effective use of pipelines in the foam insulation define the following parameters:
Simplifying the construction, maintenance and repair;
Increased service life of 30-40 years (traditional types of pipelines - 5-10 years);
Reduction of heat losses to 8% (traditional types of pipelines - 30-40%);
Reducing capital costs by 15-20% (not required construction of concrete channels and chambers for valves);
Reduced operating costs by 9 times;
Reduction in repair costs 3 times.

Send your message to this supplier
Send Now

960mm Vacuum Casing Case Shell Insulated Steel Pipe Production Line

Ask Latest Price
Watch Video
Brand Name :
Huashida
Certification :
ISO9001
Place of Origin :
Qingdao,Shandong,China
MOQ :
1
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Delivery Time :
2months
Contact Supplier
video
960mm Vacuum Casing Case Shell Insulated Steel Pipe Production Line
960mm Vacuum Casing Case Shell Insulated Steel Pipe Production Line
960mm Vacuum Casing Case Shell Insulated Steel Pipe Production Line

Qingdao Huashida Machinery Co., Ltd.

Verified Supplier
2 Years
shandong, qingdao
Since 2003
Business Type :
Manufacturer
Total Annual :
3000000-5000000
Employee Number :
100~200
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement