production range | processing capacity | Cleaning class | used material
|
159mm-1600mm | 159mm-1600mm | Sa2.5 | FBE powder, binder, polyethylene |
Steel pipe conveyor system
How does 3PE pipe bending anticorrosive production line remove rust from the outside of the steel pipe? The steel pipe body comes online from the upper pipe platform, the outer wall of the steel pipe is removed by shot blasting and rust removal machine, the finished steel pipe enters the inner shot blasting machine, and the finished internal rust removal steel pipe enters the inner ring production line for epoxy powder coating on the outer surface, when the pipe bends through the ring powder chamber, Spray powder outside the pipe by powder spray gun, and effectively shield the powder floating around, and recycle the powder through the recovery device.
Intelligent control system
1. First of all, in the mechanical AI car, the mechanical AI car is designed to sense the position of the steel pipe through the sensor, communicate with the modern industrial PLC through the chip to calculate the moving track, the steel pipe can be raised 100 mm from the bench surface, and the steel pipe can be accurately moved to the designated station through the transmission of the rack and pinion, which solves the problem of the steel pipe moving.
2. Secondly, in the coating thickness digital control device, a microcomputer digital controller controlled by a single chip computer is developed to accurately control the coating thickness. It can automatically store and call technical parameters such as powder quantity, physical and chemical quantity, electrostatic voltage, electrostatic current, etc., which solves the problem of weighing the powder quantity and changing the machine during each production of the existing knob-type spraying controller.
3. In the C-type intermediate frequency heating technology, the design of intermediate frequency voltage is 660V50HZ, 12 pulse power supply, from the high voltage line through the special transformer to provide power to the intermediate frequency, in order to achieve the purpose of rapid heating, to solve the ordinary 380V50HZ power can not meet the heating speed requirements of large steel pipe.
Technological processes:
Upload pipes→pipes screw conveyor→rust removal of intermediate frequency heating→Epoxy powder coating→outer layer soli quid & polyethylene coating→cooling spray→pipes screw conveyor→grinding pipes, send→unload pipes
Qingdao Huashida steel 3PE anticorrosive production line team has won the support of Beijing University of Chemical Technology and Qingdao University of Science and Technology, and has established a comprehensive industry-university-research cooperation relationship with it, hired professionals from scientific research institutes to give lectures, carry out professional training and guidance, and jointly cultivate innovative talents through school-enterprise cooperation. This is the talent and technical support of Huashda's research and development of 3PE anticorrosive pipe bending production line.
Qingdao Huashida Machinery Co., LTD., with the accumulation of experience in intermediate frequency coil heating technology, spray coating technology, tape cold wrapping technology, the development of 3PE anticorrosive bending production line is aimed at the above technical defects. Because Huashida has an excellent technical project team, the team brings together a group of national first-class polymer materials and equipment, polymer processing, welding, industrial automation and other professionals, with 5 authoritative experts in the industry, 3 senior engineers, 8 engineers. All new product developers are bachelor degree or above, with 3 to 10 years of experience in new product development in the industry, with an average age of 35.